Project 12 statements
The deposit 5
Key takeaway. Management of 1911 Gold describes the deposit as a narrow-vein, high-grade underground system with a current resource of 1.1 million ounces and a 62,000-hectare land position (September 2025).
Read the full summary
The company reports exploration upside from two angles: they are looking to expand the resource by about another 30–40%, and also see significant potential for a doubling or a tripling of the resource overall.
Show the other 2 statements
Jurisdiction 3
Key takeaway. Management of 1911 Gold reports that its mill is permitted, with operations located in Manitoba, Canada (September 2025).
Technical risk 4
Key takeaway. Management of 1911 Gold acknowledges a key technical risk in its project plan.
Read the full summary
The company’s assumptions require operating four separate underground mines, each with open resource at depth, while maintaining multiple working faces to ensure sufficient grade and throughput. These assumptions also rely on mining 2-to-3-meter-wide veins (no more than 4 m wide) at an average grade of six grams per ton, figures the company states as of September 2025.
Show the other 1 statement
Economics 3 statements
Economics 1
Financing 2
Key takeaway. Management of 1911 Gold reports it has raised $13.2 million and plans to use the capital on 30,000 meters of underground drilling, exploration, development, delineation drilling, and the first 300–400 meters of a ramp (September 2025).
Timeline 11 statements
Timeline 11
Key takeaway. Management of 1911 Gold laid out a series of milestones in September 2025.
Read the full summary
They said the first underground drill should be in place by the end of September and that underground drilling would commence within the next month, with another drill expected in October and potentially a third in November. Most of level 16 has been rehabbed in preparation for that drilling, and management aims to have the level fully operational with ventilation, electrical and communications, plus the hoist operational to the bottom of the mine. Two large bulk samples off level 16 are planned for 2026, with bulk samples expected to extend 3 to 5 months. A study is due in Q1 2026, and the company targets first production in early 2027.
Show the other 8 statements
Outside views 23 mentions
23 mentions by people who do not speak for the company — 23 constructive, 0 cautious, 0 neutral. These are their views, not the company's.
Show the other 19 mentions
Sources 1 interview
Every interview 1
| Date | Channel | Interview | Statements |
|---|---|---|---|
| 17 Sep 2025 | The Deep Dive | Gold’s New Paradigm! | Shaun Heinrichs - 1911 Gold | 26 |
What else those interviews covered
Every other asset named in the same recordings, by how many of them named it — the company's coverage context, not its holdings. Where the name is another company we hold a record for, it links to it.
Questions people ask
What is 1911 Gold's project and where is it?
1911 Gold is a resource gold company, with a project stated to be in Manitoba, Canada. Everything here is drawn from its executives' own interviews.
Which interviews mention 1911 Gold?
We track 1 interview mentioning 1911 Gold, across 1 channel (The Deep Dive).
What are investors saying about 1911 Gold?
23 independent voices — people who do not speak for the company — are on record discussing it (23 bullish). Their reasoning is quoted in the outside-view section above.
What do recent interviews with 1911 Gold cover?
The most-discussed topics on record are timeline, the deposit, technical risk, jurisdiction — each claim quoted and dated in the sections above.