Project 15 statements
The deposit 9
Key takeaway. Management describes the deposit as an open-pit heap leach operation with an underground component, encompassing five identified ore bodies.
Read the full summary
According to a July 2026 SRK preliminary economic assessment, the resource stands at 97 million tonnes grading about 0.61 grams per tonne. The company also notes that historic underground mining from 1997 to 2000 extracted 1 million tonnes at a reported head grade of 15 grams per tonne, and that 192 kilometers of core drilling by previous operators identified the five ore bodies. Blossom Gold points to exploration upside, stating there is potential to expand into a 150- to 200-million-tonne open pit.
Show the other 6 statements
Jurisdiction 4
Key takeaway. Management reports that its project is located in Nevada, USA, and is currently in the Notice of Intent permitting stage with the Bureau of Land Management, filed for five acres of disturbance.
Read the full summary
The company says it plans to accelerate to a Plan of Operations by leveraging an underground mine, which allows it to avoid the five-acre disturbance limit during exploration.
Show the other 1 statement
Technical risk 2
Key takeaway. Management reports that metallurgical testing is underway to confirm heap leach viability, with bottle roll and column testing expected to determine heap leach behaviour and results anticipated within six months (stated in July 2026).
Economics 6 statements
Economics 3
Key takeaway. In a July 2026 interview, management reported that it had raised $115 million in project capex and that the project economics are based on a gold price assumption of $1,350 per ounce, which the company says comes from an SRK preliminary…
Read the full summary
economic assessment.
Financing 3
Key takeaway. Management says the company acquired the project for $35 million and paid for it with a 1% royalty to the seller, while also noting that it had raised $115 million.
Read the full summary
The acquisition price and royalty structure are from the same July 2026 statement, as is the $115 million financing figure.
Timeline 10 statements
Timeline 10
Key takeaway. Management has outlined a multi-year timeline.
Read the full summary
An updated resource estimate is expected in the first quarter of 2026. The underground mine portal was scheduled to open in July 2024, with infill drilling from underground toward the end of that year, and an 80,000-foot drill program for 2024 — the company now also references an 80,000-foot drill program underway for 2026. Metallurgical column test results were anticipated from mid-June 2024 onward, with exploration drill results to follow; management separately says metallurgy bottle roll and column testing started last week with results expected within six months (around July 2026). A feasibility study is planned to start in 2027, and a construction decision is targeted by end of 2028.
Show the other 7 statements
Corporate 7 statements
Management 4
Key takeaway. Management describes a team with a mix of finance and mining experience.
Read the full summary
CEO Rick Winters notes his 20-year background as a merchant banker financing junior companies in North and South America, plus prior roles with Golden Star Resources, Fells Dodge, and as an equity analyst. The company also highlights John Seabourg (CFO, ex-Newmont), Graden Kby and Vern Baker as directors with Nevada mining experience, Aaron Calhoun (mining engineer), Dr. John Decker (geologist, Colorado School of Mines), John Shaff (general manager), Brandon Thup (IR/corp dev VP), and Alan Hlam (permitting).
Show the other 1 statement
Market 2
Key takeaway. Management says Blossom Gold is trading at about 0.8 times net asset value, while it notes that similar projects trade at 0.4 to 0.5 times NAV.
Read the full summary
The company reports this discrepancy with de-risking potential as of July 2026.
Outside views 1 mention
1 mention by people who do not speak for the company. These are their views, not the company's.
Sources 1 interview
Every interview 1
| Date | Channel | Interview | Statements |
|---|---|---|---|
| 10 Jul 2026 | Crux Investor | Made In America | Blossom Gold (TSXV:BGAU) - Visiting the Rosebud Project | 38 |
What else those interviews covered
Every other asset named in the same recordings, by how many of them named it — the company's coverage context, not its holdings. Where the name is another company we hold a record for, it links to it.
Questions people ask
What is Blossom Gold's project and where is it?
Blossom Gold is a explorer gold company, with a project stated to be in Nevada, United States. Everything here is drawn from its executives' own interviews.
Which interviews mention Blossom Gold?
We track 1 interview mentioning Blossom Gold, across 1 channel (Crux Investor).
What are investors saying about Blossom Gold?
1 independent voice — people who do not speak for the company — are on record discussing it. Their reasoning is quoted in the outside-view section above.
What do recent interviews with Blossom Gold cover?
The most-discussed topics on record are timeline, the deposit, jurisdiction, management — each claim quoted and dated in the sections above.