Project 36 statements
The deposit 20
Key takeaway. GR Silver Mining describes its deposit at San Marzel as a high-grade epithermal silver system with epithermal white structures.
Read the full summary
Management reports a total resource of 134 million ounces of silver equivalent (as of both December 2025 and May 2026), of which 68 million ounces are indicated (December 2025); the Sommer portion is 85% predominantly silver and roughly 25 meters thick on average. At Sommer, the company highlights a discovery hole of 101 meters at 306 grams per ton silver and a step-down intersection of 75 meters at 260 grams per ton silver (October and December 2025), while noting that the resource at San Marzel averages 22 meters thick with grades of 200 grams per ton plus in silver (May 2026). On exploration upside, management says only about 20% of the geophysical anomaly at Sommer has been drilled, and they plan a 20,000-meter drill program in 2026—at least doubling the prior 18,000 meters drilled over 3–3.5 years—to expand the footprint of Sommer mineralization at least two times (October and December 2025, May 2026).
Show the other 17 statements
Jurisdiction 8
Key takeaway. GR Silver Mining controls projects in the Mexican states of Sinaloa and San Marcel/Plomosas, management reports (Oct 2025, Dec 2025, May 2026).
Read the full summary
As of December 2025, the company said it is permitted for five years of exploration with 46 drill sites available. Separately, in October 2025, management stated the Plomosas mine holds permits to operate.
Show the other 5 statements
Technical risk 8
Key takeaway. Regarding technical risk, GR Silver Mining management has described several key assumptions from different dates.
Read the full summary
In December 2025, the company reported that book sample testing, mining, metallurgical test work and engineering are completed and a pilot plant is planned, while drilling currently reaches a maximum of 300–350 m below surface and can be extended to 500 m. Management also noted an average thickness of 25 m with 250–300 g/t silver plus material with wide intersections, which allows 75–100 m drill spacing. Earlier in October 2025, management said the pilot plant was under design and metallurgical test work was in progress at Plomos, with the plant design at 250 tons per day potentially increasing to 600 tons per day (permitted capacity). In May 2026, management stated that metallurgical testing for leaching and the potential for producing doré was ongoing, with a key assumption of a boiling point between 300 and 600 m depth.
Show the other 5 statements
Economics 6 statements
Economics 1
Financing 5
Key takeaway. GR Silver Mining management reports the company is fully financed with cash in the bank and no debt on the books as of May 2025.
Read the full summary
In December 2025, they stated they had raised $17.5 million in a recent financing and held approximately $28 million Canadian dollars. An earlier claim from October 2025 said funding was secured for the next 12 to 15 months, which is consistent with the later figures.
Show the other 2 statements
Timeline 16 statements
Timeline 16
Key takeaway. GR Silver Mining management has laid out a busy 2026 timeline across interviews from October and December 2025.
Read the full summary
In the near term, drill hole 11 and 12 results were expected by mid-November, and four holes (11, 12, 13, and possibly one more) were anticipated before year-end 2025. For 2026, management says they plan to complete a bulk sample test mining program with a pilot plant at the former Pomosas mine by May, along with a resource update and the commissioning of a PEA for both Columbus Pulos Mine and Sun Marciel. The company also expects to issue guidance in January and the first quarter of 2026, and to deliver a public engineering study and a resource update sometime during the year, with drilling set to roughly double from the 18,000 meters completed over the last 3–3.5 years.
Show the other 13 statements
Corporate 3 statements
Management 1
Market 1
Outside views 2 mentions
2 mentions by people who do not speak for the company — 2 constructive, 0 cautious, 0 neutral. These are their views, not the company's.
Sources 3 interviews
Every interview 3
| Date | Channel | Interview | Statements |
|---|---|---|---|
| 01 May 2026 | Crux Investor | GR Silver Mining (TSXV:GRSL) - Drilling and Pilot Plant Strategy Support Growth | 12 |
| 12 Dec 2025 | Crux Investor | GR Silver Mining (TSXV:GRSL) - $28M Deployed for Mexican Silver Discovery | 33 |
| 21 Oct 2025 | Crux Investor | GR Silver Mining (TSXV:GRSL) - Pitch Perfect, October 2025 | 16 |
What else those interviews covered
Every other asset named in the same recordings, by how many of them named it — the company's coverage context, not its holdings. Where the name is another company we hold a record for, it links to it.
Questions people ask
What is GR Silver Mining's project and where is it?
GR Silver Mining is a explorer silver company, with a project stated to be in Mexico. Everything here is drawn from its executives' own interviews.
Which interviews mention GR Silver Mining?
We track 3 interviews mentioning GR Silver Mining, across 1 channel (Crux Investor).
What are investors saying about GR Silver Mining?
2 independent voices — people who do not speak for the company — are on record discussing it (2 bullish). Their reasoning is quoted in the outside-view section above.
What do recent interviews with GR Silver Mining cover?
The most-discussed topics on record are the deposit, timeline, jurisdiction, technical risk — each claim quoted and dated in the sections above.