GreenLight Metals

Gold explorer, with a project stated to be in Wisconsin.

Nevada · United States — as stated on the recordings

explorer gold Nevada, United States
Dec 2025 → Jun 2026Covered
8 of 10Topics on record
6Figures tracked over time
1 executiveNamed on the record
Generate Claims & Checks What management and commentators said, and what still needs independent verification 5 interviews with the company · 2 independent recordings
Stage
Explorer
Primary commodity
Gold
Jurisdiction
Wisconsin
Deposit
VMS deposit
Latest appearance
02 Jun 2026
On record
5 interviews · 72 statements · 2 executives

At a glance

What the record holds today. Every card names where it came from — a management representation is not an established fact, and the page never blurs the two.

What is in the ground
4 and 1/2 million ton deposit
Management-stated Matt Filgate Jun 2026
Grade
1.3% copper and 1 g per ton gold in hole 10; 1% copper and 1 g per ton gold in hole 8
Management-stated Matt Filgate Jun 2026
Money on hand
11 and 1/2 million in the bank
Stated capital need: Barrick to spend 7.5 million US to earn into 60%, 11.5 million to earn into 70%, and pre-feasibility study (valued 15-25 million) to earn up to 80% at Calico Canyon project
Management-stated Matt Filgate Feb 2026
What happens next
maiden resource by the end of 2026, 2027
Management-stated Matt Filgate Jun 2026
The main open question
The deposit remains early-stage with only 14 holes drilled and a narrow exploration footprint (330 m × 300 m depth).
Weighed from the statements below, not our opinion of the company.
Our reading
How outsiders read it
1 independent voice on record — 2 constructive
Peter Schiff
Outside voices

How the stated figures have moved

The same figure, as management put it on the earliest and the latest recording we hold. A difference may be a genuine update, a different measure of the same thing (total against indicated), or a mis-heard number — both quotes are here, and both recordings are one click away.

Cash position ● Lower Same basis, restated 62 days apart 2 statements on record
15 Dec 2025
11 million Canadian dollars
“we have 11 million Canadian >> right now.”
16 Feb 2026
11 and 1/2 million in the bank
“as a company that's fully capitalized with 11 and 1/2 million in the bank”
Capital needed 9.5 million1 million ≠ Different basis One statement qualifies the figure and the other does not (budget, through) 5 statements on record
15 Dec 2025
9.5 million for 2026 budget
“Our our budget for 2026 is 9 and a half.”
02 Jun 2026
Greenlight receives 1 million US in cash payments from Barrick through period to earn into 60%
“then we get a million dollars US in in cash payments through that period for them to earn into 60%”
Financing ≠ Different basis One statement qualifies the figure and the other does not (financing, through) 2 statements on record
15 Dec 2025
fully funded for 2026, no financing on horizon for next time
“So, you're fully funded for 26. >> Yeah, correct. That's my next question. But yeah, there's no no financing on the horizon at least for the nex”
16 Feb 2026
fully funded through 2026
“You guys are fully funded through uh, through the 26, correct?”
Ownership about 5%around 6% ≠ Different basis One statement qualifies the figure and the other does not (management, market) 2 statements on record
15 Dec 2025
about 5% and actively buying on market
“Um insider management we're at about 5% but we're actively buying on market.”
16 Feb 2026
management owns around 6% roughly
“then management owns around 6% roughly”
Shares outstanding ≠ Different basis One statement qualifies the figure and the other does not (outstanding) 2 statements on record
15 Dec 2025
99 million shares
“we have 99 million shares 99 million shares outstanding right now.”
16 Feb 2026
99 million shares outstanding
“So 99 million shares outstanding”
Grade ? Stated at several levels 5 statements on record — these are the earliest and the latest, not a trend 5 statements on record
15 Dec 2025
1.8% copper, 2.4 g gold
“Has a historic resource of 4.5 million tons averaging 1.8% copper uh 2.4 g gold.”
02 Jun 2026
just over 1% copper and 1 g per ton gold in hole 7
“hole seven, um which intersected 30 m at uh just over a percent copper a gram gold”

Management view vs outside view

Management interviews are promotional by nature; the outside view is the counterweight. Both are quoted from the recordings, not added by us.

What management spends its time on

Counted from GreenLight Metals's own claims across 5 interviews — most-covered theme first.

What outside voices pick up on

1 independent voice — people who do not speak for the company — across 2 mentions.

2 constructive
  • Peter Schiff “Sponsored exploration pitch: he emphasizes geology, drilling, and Barrick involvement as reasons to pay attention, while disclaimi…”

Bull · Bear · Watch next

Weighed from the statements on this page — management's pitch and the outside view. Not financial advice, and not our opinion of the company.

▲ Bull case

Management says Barrick will fund $19 million of exploration (7.5 million to 60%, 11.5 million to 70%) plus a pre-feasibility study on a free carry, while GreenLight earns into 80%.

What it rests on
Evidence: 4 moments from 2 interviews
Read the full case

Management says Barrick will fund $19 million of exploration (7.5 million to 60%, 11.5 million to 70%) plus a pre-feasibility study on a free carry, while GreenLight earns into 80%. The deposit shows consistent high-grade VMS mineralization: 1.3% copper and 1 g/ton gold over 20.9 m, with 75 m of mineralization at depth suggesting significant upside, and internal targets of 15+ million tons versus the current 4.5 million ton historic resource.

▼ Bear case

The deposit remains early-stage with only 14 holes drilled and a narrow exploration footprint (330 m × 300 m depth).

What it rests on
Evidence: 2 moments from 1 interview
Read the full case

The deposit remains early-stage with only 14 holes drilled and a narrow exploration footprint (330 m × 300 m depth). A maiden resource is not expected until end-2026 or 2027, leaving 18+ months of execution risk. Outside view offers only endorsement from compensated commentators, with no independent third-party validation of the geology or resource estimates. The 11.5 million Canadian raised provides limited runway if Barrick delays or reduces funding.

◆ Watch next

Near-term: results on a 2–3 week drilling cadence through a 7,000 m campaign targeting 10+ million tons by year-end and adding 400–450 m of strike extent.

What it rests on
Evidence: 3 moments from 2 interviews
Read the full case

Near-term: results on a 2–3 week drilling cadence through a 7,000 m campaign targeting 10+ million tons by year-end and adding 400–450 m of strike extent. Medium-term: maiden resource delivery by end-2026/2027. Key decision: Barrick's choice to continue funding to 70% (11.5 million) and pursue the pre-feasibility study that would value the deposit and unlock earn-up to 80%.

Each moment links to the exact point in the source recording. The cases are drawn from the transcripts, weighed as written — they are not a rating, a target or a recommendation.

Project 37 statements

The deposit 20

Key takeaway. Management describes GreenLight Metals as a VMS (volcanogenic massive sulfide) project with a current resource of about 4.5 million tons.

Read the full summary

They have reported varying grades across holes: hole 7 returned just over 1% copper and 1 g/t gold (June 2026), while earlier holes in December 2025 and February 2026 returned higher grades of about 1.7–1.8% copper and 2.4–2.5 g/t gold. On exploration upside, the company says the deposit is open along strike to the northeast and southwest and has been drilled to about 450 m depth, noting that some of the world's largest VMS deposits extend to 2–3 km depth. They also point to step-outs of 250–450 m from the existing resource and a hole intersecting 75 m of mineralization deeper than current drilling, with potential to "essentially double the size of the deposit."

What was actually said
deposit type
VMS deposit
“these types of VMS deposits, they don't come along very often”
Matt Filgate· 02 Jun 2026·
exploration upside
stepped out 250 m of strike; holes now 140 m step out from hole 7; 100 to 150 m step outs along strike
“we've drilled out another 250 m of strike...These new holes that we just announced, uh hole eight and hole 10, are now 140 m step out from hole seven...You know, we're stepping out on you know, 100 to 150 m step outs”
Matt Filgate· 02 Jun 2026·
exploration upside
open to the northeast and southwest along strike; drilled to about 450 m depth, with some of world's largest VMS deposits at 2-3 km mine depth; hole 9 intersected 75 m of mineralization deeper than current drilling
“But it's open to the southwest as well...We've drilled this thing down to about 450 m, which is very shallow for a VMS deposit...Kidd Creek is an example...hole nine, which we announced in the previous press release visuals on that, where we intersected 75 m of mineralization, strong mineralization”
Matt Filgate· 02 Jun 2026·
Show the other 17 statements
grade
1.3% copper and 1 g per ton gold in hole 10; 1% copper and 1 g per ton gold in hole 8
“The results that we saw in hole 10, 20.9 m at 1.3% copper and a and a gram gold...hole eight we saw 27 m at 1% copper and 1 g per ton gold”
Matt Filgate· 02 Jun 2026·
grade
just over 1% copper and 1 g per ton gold in hole 7
“hole seven, um which intersected 30 m at uh just over a percent copper a gram gold”
Matt Filgate· 02 Jun 2026·
resource size
4 and 1/2 million ton deposit
“the 4 and 1/2 million tons at Bend is contained in a 330 m strike area”
Matt Filgate· 02 Jun 2026·
deposit type
VMS project
“Just a reminder viewers, that's our VMS project that sits in Wisconsin.”
Matt Filgate· 29 Apr 2026·
exploration upside
15 million tons plus
“we have an internal um an internal exploration target of 15 million tons plus.”
Matt Filgate· 29 Apr 2026·
grade
2% copper and around 2 and 1/2 grams gold, or 4 and 1/2% copper equivalent
“4 and 1/2% copper equivalent at current prices. And so these results really highlight that.”
Matt Filgate· 29 Apr 2026·
resource size
4 and 1/2 million tons
“It has a historic resource of 4 and 1/2 million tons and the the grades that are pretty stellar. 4 and 1/2 tons 4 and 1/2 million tons”
Matt Filgate· 29 Apr 2026·
deposit type
VMS deposit
“it's a VMS deposit”
Matt Filgate· 16 Feb 2026·
exploration upside
step out around 450 m from the edge of existing resource
“the furthest step out of this program is around 450 m from the edge of that existing resource”
Matt Filgate· 16 Feb 2026·
exploration upside
essentially double the size of the deposit
“we'll be looking to essentially double the size of the deposit while increasing at depth”
Matt Filgate· 16 Feb 2026·
exploration upside
34 m at 3 and 1/2% copper equivalent
“the big result we had there was around 34 m at 3 and 1/2% copper equivalent”
Matt Filgate· 16 Feb 2026·
grade
1.7% copper, 2 and 1/2 grams gold
“Very good grades. It's averaging around 1.7% copper, 2 and 1/2 grams gold”
Matt Filgate· 16 Feb 2026·
resource size
4 and 1/2 million tons
“there's a historic resource there 4 and 1/2 million tons”
Matt Filgate· 16 Feb 2026·
deposit type
VMS (Volcanogenic Massive Sulfide)
“So our our flagship assets are Bend project. So was drilled in the '9s. Has a historic resource of 4.5 million tons averaging 1.8% copper uh 2.4 g gold.”
Matt Filgate· 15 Dec 2025·
exploration upside
22 m at 3 g gold and 2% copper stepped out 150 m down dip
“we stepped out 150 m, went down, dip, and we intersected some incredible massive sulfide, uh, high high copper, high gold. So 22 uh 22 m at 3 g gold and 2% copper.”
Matt Filgate· 15 Dec 2025·
grade
1.8% copper, 2.4 g gold
“Has a historic resource of 4.5 million tons averaging 1.8% copper uh 2.4 g gold.”
Matt Filgate· 15 Dec 2025·
resource size
4.5 million tons
“Has a historic resource of 4.5 million tons averaging 1.8% copper uh 2.4 g gold.”
Matt Filgate· 15 Dec 2025·

Jurisdiction 11

Key takeaway. Management highlights that GreenLight Metals operates entirely in the United States, with projects in Nevada (Calico Canyon) and Wisconsin (the Bend project, about 19 miles from Medford).

Read the full summary

On permitting, the company's statements differ over time: in December 2025 management described the project as at the exploration stage with drill permits expected in 60 to 90 days, while by February and April 2026 the company reported being fully permitted and specifically permitted to drill with the Wisconsin Department of Natural Resources. The CEO also noted in December 2025 positive feedback from the community and that site tours had been conducted.

What was actually said
country
United States (Nevada for Calico Canyon; Wisconsin for Bend project)
“our Calico Canyon project in Nevada...Lobo and Lobo East in Wisconsin...The Bend project”
Matt Filgate· 02 Jun 2026·
country
United States
“that's where we're that's where we are.”
Matt Filgate· 29 Apr 2026·
permit status
permitted to drill with Department of Natural Resources in Wisconsin
“we have a very close relationship with the uh Department of Natural Resources in Wisconsin who's permitted this project”
Matt Filgate· 29 Apr 2026·
Show the other 8 statements
region
Wisconsin, about 19 miles from Medford
“The Ben project sits just outside of Medford, Wisconsin about 19 miles away.”
Matt Filgate· 29 Apr 2026·
country
United States
“mining in Wisconsin”
Matt Filgate· 16 Feb 2026·
permit status
fully permitted
“fully permitted two drills mobilized to site”
Matt Filgate· 16 Feb 2026·
region
Wisconsin
“our Ben project in Wisconsin”
Matt Filgate· 16 Feb 2026·
community agreement
positive feedback from community, site tours conducted
“we bring people out to site. We were doing probably two to three site tours a week in our last drill program, whether it was the DNR, um, local groups, uh, you know, that have interest in that area and just showing them this is this is the measures that we're taking to protect the environment while we explore. And so we've we've actually seen a lot of positive feedback”
Matt Filgate· 15 Dec 2025·
country
United States
“Wisconsin's a is a unique jurisdiction. It's something that I think a lot of your viewers probably don't think about when they think about mining”
Matt Filgate· 15 Dec 2025·
permit status
60 to 90 days for drill permits, exploration stage
“we're on the expiration side. We're not actively mining. We don't have a permit um uh submitted to mine. Um so, we're we're on the expiration side. We've we found it very straightforward to to explore in Wisconsin. We're looking at typically anywhere from 60 to 90 days to get a drill permit.”
Matt Filgate· 15 Dec 2025·
region
Wisconsin
“you guys are in Wisconsin. I've never heard of that. And uh I that's a great thing. But uh talk to me about the jurisdiction. You're in Wisconsin”
Matt Filgate· 15 Dec 2025·

Technical risk 6

Key takeaway. Management says the project's technical risk centers on economic scale.

Read the full summary

The company stated in December 2025 that 10 million tons are required for economic viability, and that the open questions are "Can this be economic? How big can this deposit get?" By February 2026 the existing footprint was reported as 330 m by a vertical depth of around 300 m. Drilling results, according to the company, include about 40–50 m of massive sulfide in holes eight and ten (April 2026), 75 m of mineralization in hole nine (April 2026), and consistent mineralization in 13 of 14 holes, with only one hole hitting the system too high (June 2026).

What was actually said
key assumption
14 holes drilled, only missed on one hole (hit system too high); consistent mineralization at all other holes
“I think we're we're on we're on the 14th hole of of uh our drilling campaign between phase one and phase two, and we've only missed on one hole. And that's cuz we hit the system up too high. So, that was a vector in gold. Every other hole has hit thick mineralization”
Matt Filgate· 02 Jun 2026·
key assumption
40 50 m of massive sulfide in holes eight and ten
“holes eight and holes 10 are 125 m step out along strike. And both of those intersected anywhere between 40 50 m of massive sulfide as well.”
Matt Filgate· 29 Apr 2026·
key assumption
75 m of mineralization in hole nine
“Hole nine which is an 80 m undercut of hole seven which we just released intersected 75 m of mineralization.”
Matt Filgate· 29 Apr 2026·
Show the other 3 statements
key assumption
existing footprint 330 m by vertical depth of around 300 m
“the existing footprint of the deposit is 330 m by vertical depth of around 300 m”
Matt Filgate· 16 Feb 2026·
key assumption
10 million tons required for economic viability
“our internal number is 10 million tons. We want to see 10 million plus tons.”
Matt Filgate· 15 Dec 2025·
stated risk
Can this be economic? How big can this deposit get?
“And the idea was, let's not just go back to the 330 m known VMS deposit and plunk holes into it. Uh, let's step out and see how big this can get. Right? That's always the question is this, you know, can this be economic?”
Matt Filgate· 15 Dec 2025·

Economics 10 statements

Financing 10

Key takeaway. Management reports the company was fully funded for 2026 as of December 2025, with 11 million Canadian dollars in the bank and a budget of 9.5 million for the year.

Read the full summary

By February 2026, the company had raised 11.5 million Canadian dollars (with no warrants) and stated it had around 8.5 million needed for the year, with 11.5 million in the bank and full funding through 2026. In April 2026, management said 11.5 million had been raised. Separately, management noted that under the Barrick earn-in agreement, GreenLight receives 1 million US in cash payments through the period to earn into 60% (by June 2026), while Barrick is to spend 7.5 million US to earn 60%, 11.5 million to earn 70%, and a pre-feasibility study (valued at 15–25 million) to earn up to 80% at the Calico Canyon project (also by June 2026).

What was actually said
capital needed
Barrick to spend 7.5 million US to earn into 60%, 11.5 million to earn into 70%, and pre-feasibility study (valued 15-25 million) to earn up to 80% at Calico Canyon project
“they got to spend 7 and 1/2 million US on exploration...To get to 70% they got to spend 11 and 1/2 million and then to earn up to 80% they got to do a pre-feasibility study which you know is valued somewhere in that 15 to 25 million dollar US range”
Matt Filgate· 02 Jun 2026·
capital needed
Greenlight receives 1 million US in cash payments from Barrick through period to earn into 60%
“then we get a million dollars US in in cash payments through that period for them to earn into 60%”
Matt Filgate· 02 Jun 2026·
capital needed
11 and 1/2 million raised
“The capital that we raised at the end of last year, 11 and 1/2 million, and started started drilling this thing.”
Matt Filgate· 29 Apr 2026·
Show the other 7 statements
capital needed
around 8 and 1/2 million for this year
“our budget for this year is around 8 and 1/2 million”
Matt Filgate· 16 Feb 2026·
cash position
11 and 1/2 million in the bank
“as a company that's fully capitalized with 11 and 1/2 million in the bank”
Matt Filgate· 16 Feb 2026·
dilution
11 and 1/2 million Canadian raised, no warrant
“We we raised 11 and 1/2 million Canadian. It was a life offering. There was no warrant associated with it”
Matt Filgate· 16 Feb 2026·
financing status
fully funded through 2026
“You guys are fully funded through uh, through the 26, correct?”
Matt Filgate· 16 Feb 2026·
capital needed
9.5 million for 2026 budget
“Our our budget for 2026 is 9 and a half.”
Matt Filgate· 15 Dec 2025·
cash position
11 million Canadian dollars
“we have 11 million Canadian >> right now.”
Matt Filgate· 15 Dec 2025·
financing status
fully funded for 2026, no financing on horizon for next time
“So, you're fully funded for 26. >> Yeah, correct. That's my next question. But yeah, there's no no financing on the horizon at least for the nex”
Matt Filgate· 15 Dec 2025·

Timeline 16 statements

Timeline 14

Key takeaway. GreenLight Metals management has laid out a busy timeline that has shifted as the project has progressed.

Read the full summary

After completing a 2,000-meter drill program in early September 2025 and listing on the TSXV in April 2026, the company began its first drill in February 2026 with results expected mid-March. Management later reported a 7,000-meter drilling campaign, with results on a two-to-three-week cadence, aiming to add about 400–450 m of strike extent. Across various statements, the company has consistently targeted a maiden resource by the end of 2026, with earlier mentions of a 10-plus-million-tonne range by end of 2026 and a broader plan of 15,000 to 30,000 meters of drilling in 2026.

What was actually said
milestone
maiden resource by the end of 2026, 2027
“Really pushing towards that maiden resource by the end of 2026, 2027”
Matt Filgate· 02 Jun 2026·
milestone
2026 is the year that the company will bulk up and start to advance projects towards resource stage and discovery potential stage
“2026 is a the year that we really bulk up and and start to advance our projects towards resource stage, and then also discovery potential stage”
Matt Filgate· 02 Jun 2026·
milestone
results on a two to three week cadence
“we should have results sort of on a two to three week cadence here on out.”
Matt Filgate· 29 Apr 2026·
Show the other 11 statements
milestone
drilling 7,000 m to add about 400 450 m of strike extent
“We're doing 7,000 m right now and looking to add about 400 450 m of strike extent to the existing deposit”
Matt Filgate· 29 Apr 2026·
milestone
10 plus million ton range by the end of this year
“really trying to push it towards that 10 plus million ton range by the end of this year”
Matt Filgate· 16 Feb 2026·
milestone
7,000 m drilling campaign
“this drilling campaign which is 7,000 meters two drills”
Matt Filgate· 16 Feb 2026·
milestone
drill results expected mid-March
“Probably looking at sometime in mid-March”
Matt Filgate· 16 Feb 2026·
milestone
listed on TSXV back in April
“when we listed on the TSXV um back in April”
Matt Filgate· 16 Feb 2026·
milestone
first drill started this afternoon or evening
“I believe the first drill should start turning this afternoon if not you know, this evening”
Matt Filgate· 16 Feb 2026·
milestone
maiden resource at the end of 2026
“advance it towards a maiden resource at the end of 2026 which is our focus as a company”
Matt Filgate· 16 Feb 2026·
milestone
15,000 to 30,000 meters of drilling planned in 2026
“you know in 2026 we're looking at uh our first phase will be around 15,000 meters of drilling and then we'll push that out um likely add another 12 to 15,000 by the end of the year. So somewhere in that 25 to 30,000 meter range on our on our bend asset.”
Matt Filgate· 15 Dec 2025·
milestone
drilling launch in early January, assays mid-February to early March
“the announcement of drilling here in early January. So, we're going to launch drilling. Um, assay turnaround is usually a month, a month and a half from that. So expect midFebruary, early March lots of assays to be coming out.”
Matt Filgate· 15 Dec 2025·
milestone
2,000 meter drill program wrapped up early September
“we just launched our our 2,000 meter drill program which wrapped up uh it would have been early September.”
Matt Filgate· 15 Dec 2025·
milestone
resource estimate by end of 2026
“advancing it towards a resource at the end of 2026 with that 10 million plus uh ton mark in in mind.”
Matt Filgate· 15 Dec 2025·

Catalysts 2

Key takeaway. Management says the company's next major catalyst is the acquisition of a secondary VMS asset in Wisconsin during 2026.

Read the full summary

They also report that drill results and assays are expected between mid-February and early March 2026. Both timetables were provided in December 2025.

What was actually said
next milestone
secondary VMS asset acquisition in Wisconsin during 2026
“we're going to be looking for other assets as well, especially in the state of Wisconsin. So, looking to grow the company over 2026 and get a secondary asset um VMS asset.”
Matt Filgate· 15 Dec 2025·
upcoming result
drill results and assays mid-February to early March 2026
“the announcement of drilling here in early January. So, we're going to launch drilling. Um, assay turnaround is usually a month, a month and a half from that. So expect midFebruary, early March lots of assays to be coming out.”
Matt Filgate· 15 Dec 2025·

Corporate 9 statements

Share structure 5

Key takeaway. Management reports that as of December 2025 and again in February 2026 the company had 99 million shares outstanding.

Read the full summary

On insider ownership the numbers differ by date: management said it held about 5% and was actively buying on market in December 2025, then said it owned roughly 6% in February 2026. The company also noted 8.8 million warrants outstanding as of December 2025, with an average strike price of 45 cents.

What was actually said
insider stake
management owns around 6% roughly
“then management owns around 6% roughly”
Matt Filgate· 16 Feb 2026·
shares outstanding
99 million shares outstanding
“So 99 million shares outstanding”
Matt Filgate· 16 Feb 2026·
insider stake
about 5% and actively buying on market
“Um insider management we're at about 5% but we're actively buying on market.”
Matt Filgate· 15 Dec 2025·
Show the other 2 statements
shares outstanding
99 million shares
“we have 99 million shares 99 million shares outstanding right now.”
Matt Filgate· 15 Dec 2025·
warrants
8.8 million with average strike of 45 cents
“uh warrants 8.8 million. The last financing we did which was 11.5 12 million there was no warrants attached to that. Um so the average strike on the existing warrants is 45.”
Matt Filgate· 15 Dec 2025·

Market 4

Key takeaway. Management says the market is taking notice of its project, noting Barrick entered a joint venture agreement in June 2026 where it can earn up to 80% in Calico Canyon on a free carry for GreenLight shareholders.

Read the full summary

The company also points to cost advantages: drilling costs run about 320 Canadian dollars per meter in Wisconsin, roughly half the price in Nevada. On grade, the company reports 2% copper and 2.5 g/t gold, which it says are significantly higher than average VMS deposits, and it is targeting a high-grade VMS deposit of 10+ million tons.

What was actually said
strategic interest
Barrick entered into joint venture agreement; can earn up to 80% in Calico Canyon on free carry for Greenlight shareholders
“we ended up in in pretty good discussions with Barrick. We were able to negotiate a joint venture agreement with them. So, they can earn up to 80% in the Calico Canyon free carry for our shareholders”
Matt Filgate· 02 Jun 2026·
cost curve position
2% copper and 2 and 1/2 g gold grades significantly higher than average VMS deposits
“we have an average rate of 2 and 1/2 g per ton, that is significantly higher than your average VMS deposit.”
Matt Filgate· 29 Apr 2026·
cost curve position
drilling costs around 320 Canadian a meter in Wisconsin, about half the price in Nevada
“our costs down pretty good. Like we're kind of all in all in costs for drilling is around 320 Canadian a meter.”
Matt Filgate· 29 Apr 2026·
Show the other 1 statement
cost curve position
High-grade VMS deposit targeting 10+ million tons
“we think that this deposit can become 10 plus million tons. And so the focus for 2026 is stepping out and continuing to drill it along strike and down dip uh adding adding significant tonnage”
Matt Filgate· 15 Dec 2025·

Outside views 2 mentions

2 mentions by people who do not speak for the company — 2 constructive, 0 cautious, 0 neutral. These are their views, not the company's.

Peter Schiff
bullish
Sponsored exploration pitch: he emphasizes geology, drilling, and Barrick involvement as reasons to pay attention, while disclaiming risk.
The Silver Market· 14 Jun 2026·
Peter Schiff
bullish
This is a sponsored segment touting its Wisconsin copper-gold project and drilling activity, though he discloses compensation.
Peter Schiff· 13 Jun 2026·

Sources 5 interviews

Every interview 5

DateChannelInterviewStatements
02 Jun 2026 Natural Resource Stocks Barrick Just Moved Into GreenLight Metals’ Nevada Gold Project 13
29 Apr 2026 Natural Resource Stocks 75 Meters Of Mineralization Could Change GreenLight Metals 14
16 Feb 2026 Natural Resource Stocks GreenLight Metals Two Drills Mobilized in Wisconsin Copper Gold VMS TSXV GRL 22
12 Jan 2026 Natural Resource Stocks Wisconsin Reopened Mining And GreenLight Moved First No claims identified
15 Dec 2025 Natural Resource Stocks GreenLight Metals GRL High Grade Copper Gold VMS In Wisconsin 23

What else those interviews covered

Every other asset named in the same recordings, by how many of them named it — the company's coverage context, not its holdings. Where the name is another company we hold a record for, it links to it.

copper 3
gold 3
wisconsin 3
otcqb 2
tsxv 2
ben project 2
bend project 2
greenlight metals (tsxv) 1

Questions people ask

What is GreenLight Metals's project and where is it?

GreenLight Metals is a explorer gold company, with a project stated to be in Nevada, United States. Everything here is drawn from its executives' own interviews.

Which interviews mention GreenLight Metals?

We track 5 interviews mentioning GreenLight Metals, across 1 channel (Natural Resource Stocks).

What are investors saying about GreenLight Metals?

2 independent voices — people who do not speak for the company — are on record discussing it (2 bullish). Their reasoning is quoted in the outside-view section above.

What do recent interviews with GreenLight Metals cover?

The most-discussed topics on record are the deposit, timeline, jurisdiction, financing — each claim quoted and dated in the sections above.

How to read this page

What is here

Statements made by company representatives in the interviews listed above — each one carrying the words that made it, the date, and the recording. Nothing is added from any other source: if it was not said on a recording, it is not on this page. The one exception lives in the Claims & Checks record, which cites a metal price from our own feed so a stated cost can be set against it — and labels it as ours wherever it appears.

What is not verified

All of it. Resource figures, economics, timelines and promotional framing are management's own representations, checked against no filing and no technical report. Transcripts are automatic; we repair a clearly mis-heard word but never a number, a date, a unit or a speaker's hedge — “about 8.6 million ounces” keeps its “about”.

How to use it

Treat it as a map of what has been said, not as a source of fact. Where a figure matters to you, open the recording and read the company's filings. Nothing here is financial advice, a recommendation, or an offer to buy or sell any security — these are interested parties discussing their own company.