Investigator SilverASX:IVR

Silver developer, with a project stated to be in South Australia.

NoneAustralia — as stated on the recordings

developer silver NoneAustralia
Mar 2026Covered
8 of 10Topics on record
1 executiveNamed on the record
Stage
Developer
Primary commodity
Silver
Jurisdiction
South Australia
Deposit
mine life 11 years, 9 years mining, 2 years construction
Latest appearance
24 Mar 2026
On record
1 interview · 43 statements · 2 executives

At a glance

What the record holds today. Every card names where it came from — a management representation is not an established fact, and the page never blurs the two.

What is in the ground
about 4.7 million ounces of silver for first couple of years; 1.3 million ounces in stockpiles after first year
Management-stated Mar 2026
Grade
Life of mine average 90 g/t; first 2-3 years average 130 g/t producing ~4.7 million ounces of silver on average
Management-stated Michael Wallace Mar 2026
Money on hand
Well funded, moving into execution and development toward FID
Stated capital need: 2 years of construction
Management-stated Michael Wallace Mar 2026
What happens next
Moving toward FID and into execution phase
Management-stated Michael Wallace Mar 2026
The main open question
No independent view is on record.
Weighed from the statements below, not our opinion of the company.
Our reading

Management view vs outside view

Management interviews are promotional by nature; the outside view is the counterweight. Both are quoted from the recordings, not added by us.

What management spends its time on

Counted from Investigator Silver's own claims across 1 interview — most-covered theme first.

What outside voices pick up on

No independent commentary on record yet — so far the page carries only the company's own voice.

Bull · Bear · Watch next

Weighed from the statements on this page — management's pitch and the outside view. Not financial advice, and not our opinion of the company.

▲ Bull case

Management says the Paris mine is a shallow, low-complexity 11-year open pit with grid of flat tabular ore: 1.3 million oz in year-one stockpiles worth ~$120 million AUD, ramping to $500 million later, on a 4.7 million oz/year run rate at…

What it rests on
Evidence: 3 moments from 1 interview
Read the full case

Management says the Paris mine is a shallow, low-complexity 11-year open pit with grid of flat tabular ore: 1.3 million oz in year-one stockpiles worth ~$120 million AUD, ramping to $500 million later, on a 4.7 million oz/year run rate at 130 g/t for the first three years. At $80 USD/oz the DFS shows $1.2 billion pre-tax NPV, 93% IRR and 11-month payback; economics hold even at $60 USD/oz ($618 million NPV, 61% IRR, 13-month payback). The CEO led KMT mine through permitting, funding and development on time and on budget.

▼ Bear case

No independent view is on record.

What it rests on
Evidence: 2 moments from 1 interview
Read the full case

No independent view is on record. The deposit sits in a 15 km corridor with modest historical drilling; management is in early-stage execution with a four-person geology team and must conduct detailed infill drilling to support debt-service assumptions for the first three years. The economics rest on an 11-year production profile and successful ramp-up; the DFS was stress-tested to lender thresholds but no outside voice has validated the resource, the metallurgy or the financing path.

◆ Watch next

Drill rig mobilization next week for pit expansion (north, south, east) in currently inferred areas; detailed infill drilling of high-density zones within the first three years to de-risk debt repayment; path to Final Investment Decision.

What it rests on
Evidence: 2 moments from 1 interview
Read the full case

Drill rig mobilization next week for pit expansion (north, south, east) in currently inferred areas; detailed infill drilling of high-density zones within the first three years to de-risk debt repayment; path to Final Investment Decision. The company says it is well-funded and moving toward execution.

Each moment links to the exact point in the source recording. The cases are drawn from the transcripts, weighed as written — they are not a rating, a target or a recommendation.

Project 19 statements

The deposit 13

Key takeaway. Management describes the Investigator Silver deposit as a flat, tabular, shallow open-pit ore body starting about 10 metres below surface, 400 metres wide and 1 kilometre long, at a depth of about 175 metres.

Read the full summary

They report a mine life of approximately 11 years (9 years mining, 2 years construction), with plant capacity of 1.5 million tons per annum. The company states a life-of-mine average headgrade of about 90 g/t, with the first two to three years averaging about 130 g/t and producing roughly 4.7 million ounces of silver annually. First-year stockpiles are said to contain approximately 1.3 million ounces of recoverable payable silver, with a net realizable value of about $120 million AUD after processing and sales costs, growing to roughly $500 million later in the mine life. On exploration upside, management points to a 15 km long mineralized corridor with modest drilling: 8 metres at 260 g/t 5 km north, and 20 metres at 160 g/t (including 5.5 metres at almost 500 g/t) 10 km south; they note current drilling is targeting expansion of the pit north, south and east into areas that are currently in the inferred category.

What was actually said
deposit type
mine life 11 years, 9 years mining, 2 years construction
“about a 11 year mine life of which nine of that was actually mining and two of construction”
Unknown speaker· 24 Mar 2026·
deposit type
open pit, flat, tabular, shallow (175m deep)
“The or body itself you really well suited to open pit development is flat is tabular.”
Unknown speaker· 24 Mar 2026·
deposit type
open pit, tabular, flat ore body starting about 10 m below surface, 400 m wide, 1 km long
“the or body itself you really well suited to open pit development is flat is tabular. It starts from about in terms of the or body starts about 10 m below uh the base of the surface”
Michael Wallace· 24 Mar 2026·
Show the other 10 statements
exploration upside
15 km long mineralized corridor with results 5 km north (8 m at 260 g/t) and 10 km south (20 m at 160 g/t including 5.5 m at almost 500 g/t); drilling to expand pit north, south and east currently in inferred category
“Paris itself actually sits within a 15 km long uh mineralized corridor. It's had uh modest drilling throughout the area. We've had some excellent results about 5 km to the north of Paris. We had 8 m at,260 g a ton.”
Michael Wallace· 24 Mar 2026·
exploration upside
15 km long mineralized corridor with modest drilling; 8m at 260 g/ton 5km north; 20m at 160 g/ton 10km south including 5.5m at almost 500 g/ton
“Paris itself actually sits within a 15 km long uh mineralized corridor...had 8 m at,260 g a ton...20 m 160 g a ton and uh included within that is 5 5 m almost 500 g a ton.”
Unknown speaker· 24 Mar 2026·
grade
Life of mine average 90 g/t; first 2-3 years average 130 g/t producing ~4.7 million ounces of silver on average
“average headgrade about 130 g a ton for the first couple of years producing on average about 4.7 million ounces of of silver. And that's compared with a life of mine about 90 g per ton.”
Michael Wallace· 24 Mar 2026·
grade
average headgrade about 130 g per ton for first couple of years; life of mine about 90 g per ton
“And we've deliberately staged the pit...result in an average headgrade about 130 g a ton for the first couple of years...compared with a life of mine about 90 g per ton.”
Unknown speaker· 24 Mar 2026·
resource size
about 4.7 million ounces of silver for first couple of years; 1.3 million ounces in stockpiles after first year
“producing on average about 4.7 million ounces of of silver...by the first year, by the end of that first year, those stock piles actually contain about 1.3 million ounces”
Unknown speaker· 24 Mar 2026·
resource size
Mine life approximately 11 years (9 years mining, 2 years construction)
“over about a a 11 year mine life of which nine of that was actually mining and two of construction”
Michael Wallace· 24 Mar 2026·
resource size
First year stockpiles contain approximately 1.3 million ounces of recoverable payable silver
“by the first year, by the end of that first year, those stock piles actually contain about 1.3 million ounces of recoverable payable silver.”
Michael Wallace· 24 Mar 2026·
resource size
Plant capacity 1.5 million tons per annum
“we landed on a plant that was set to 1.5 million tons peranom because it really sits in the middle of a range that that can comfortably achieve the lending metrics”
Michael Wallace· 24 Mar 2026·
resource size
First year stockpiles net realizable value approximately $120 million AUD after processing and sales costs; growing to ~$500 million later in mine life
“those stock piles actually contain about 1.3 million ounces of recoverable payable silver. So this is around 120 million in Aussie terms of net realizable value after the first year. And I guess this grows to around $500 million later in the mine life”
Michael Wallace· 24 Mar 2026·
resource size
400 m wide, 1 km long
“We literally have an old body is 400 m wide a kilometer long.”
Unknown speaker· 24 Mar 2026·

Jurisdiction 2

Key takeaway. Management states that Investigator Silver's project is located in South Australia, Australia (Mar 2026).

Read the full summary

The company points to this jurisdiction when discussing the project's location and regulatory environment.

What was actually said
country
Australia
“We are building Australia's only pure play silver mine at our Paris silver project in South Australia.”
Unknown speaker· 24 Mar 2026·
region
South Australia
“We are building Australia's only pure play silver mine at our Paris silver project in South Australia.”
Unknown speaker· 24 Mar 2026·

Technical risk 4

Key takeaway. Management states the project carries a low risk profile for both jurisdictional and operational aspects, citing a shallow open pit of 175 m depth.

Read the full summary

On metallurgy, the company reports two well-proven flow sheets: a chloride leach with conventional zinc precipitation, and a heap leach cyanide process with conventional mercury zinc precipitation to extract doré bar. The March 2026 DFS was stress-tested using a lower price, lower grade, higher costs, and a reduced ramp-up rate to satisfy lender debt service cover ratio requirements, according to management.

What was actually said
key assumption
DFS stress-tested with lower price, lower grade, higher costs, and reduced ramp-up rate to meet lender debt service cover ratio requirements
“we lowered that price, we lowered the grade, higher, put the costs up and uh reduced the the rate of ramp up. And and the question I guess we were really answering or asking was, you know, what design will hold up under the stress conditions that will meet the lender requirements particularly around debt service cover ratio.”
Michael Wallace· 24 Mar 2026·
metallurgy
Heap leach cyanide with conventional mercury zinc precipitation to extract dore bar
“The flow sheet itself is a holore cyanide leech with you conventional mercro uh zinc precipitation to extract the doray bar.”
Michael Wallace· 24 Mar 2026·
metallurgy
chloride leach with conventional zinc precipitation; well-proven flow sheet
“The flow sheet itself is a holore cyanide leech with you conventional mercro uh zinc precipitation...It's a lowc cost wellproven flow sheet.”
Unknown speaker· 24 Mar 2026·
Show the other 1 statement
stated risk
Low complexity project with low risk profile for jurisdictional and operational aspects; shallow open pit of 175 m depth
“It's just it's just a very low complexity project. I mean, I talk about an open pit, but it's a very shallow open pit. It's only 175 m deep. I mean, it's a glorified quarry. Um, and that just makes it really easy to to execute.”
Michael Wallace· 24 Mar 2026·

Economics 14 statements

Economics 12

Key takeaway. Management outlined the project economics based on a definitive feasibility study (DFS) completed in March 2026.

Read the full summary

The company reports a pre-tax net present value of $1.2 billion at an $80 US/oz silver price and $618 million at $60 US/oz, with corresponding pre-tax internal rates of return of 93% and 61%, respectively. Payback periods are estimated at 11 months at the $80 US/oz scenario and 13 months at $60 US/oz. The DFS used $80 US/oz (spot at the time) and $60 US/oz (long-term consensus) as price assumptions, while the pit was designed using approximately $70 AUD/oz ($48 US/oz). Management describes the operation as a low-cost bulk mining shallow open pit (175 m depth) with a 1.5-million-tonne-per-annum plant, using a whole-ore cyanide leach with conventional Merrill-Crowe zinc precipitation, and notes a two-year construction period.

What was actually said
capex
2 years of construction
“about a 11 year mine life of which nine of that was actually mining and two of construction”
Unknown speaker· 24 Mar 2026·
irr
93% at $80 USD; 61% at $60 USD
“had a 93% IRRa and only 11 month payback...61% IRRa with about 13 month payback.”
Unknown speaker· 24 Mar 2026·
irr
At $80 US/oz: 93% pre-tax; At $60 US/oz: 61%
“had a 93% IRRa and only 11 month payback. But even at much more conservative pricing, so $60 long-term consensus, uh, still delivering about $618 million MPV, 61% IRRa”
Michael Wallace· 24 Mar 2026·
Show the other 9 statements
npv
At $80 US/oz: $1.2 billion pre-tax; At $60 US/oz: $618 million
“At 80 US DFS delivered some really strong results. So MPV pre-tax about $1.2 billion over about a a 11 year mine life”
Michael Wallace· 24 Mar 2026·
npv
$1.2 billion pre-tax at $80 USD; $618 million pre-tax at $60 USD
“So MPV pre-tax about $1.2 billion over about a a 11 year mine life...still delivering about $618 million MPV”
Unknown speaker· 24 Mar 2026·
operating cost
plant set to 1.5 million tons per annum
“we landed on a plant that was set to 1.5 million tons peranom”
Unknown speaker· 24 Mar 2026·
operating cost
low cost bulk mining operation; holore cyanide leech with conventional mercro zinc precipitation
“It's a lowc cost wellproven flow sheet. It's a lowcost bulk mining operation”
Unknown speaker· 24 Mar 2026·
operating cost
Low cost bulk mining operation with shallow open pit of only 175 m depth
“it's a very low cost well-proven flow sheet. It's a lowcost bulk mining operation. It's only 175 m deep. I mean, it's a glorified quarry.”
Michael Wallace· 24 Mar 2026·
payback
At $80 US/oz: 11 months; At $60 US/oz: 13 months
“had a 93% IRRa and only 11 month payback. But even at much more conservative pricing, so $60 long-term consensus, uh, still delivering about $618 million MPV, 61% IRRa with about 13 month payback.”
Michael Wallace· 24 Mar 2026·
payback
11 months at $80 USD; 13 months at $60 USD
“had a 93% IRRa and only 11 month payback...61% IRRa with about 13 month payback.”
Unknown speaker· 24 Mar 2026·
price assumption
DFS scenarios: $80 US/oz (spot at time) and $60 US/oz (long-term consensus); pit designed using $70 AUD/oz equivalent (~$48 US/oz)
“We did one at spot at the time which about 80 US and one at consensus long-term consensus which closer to 60 US. We designed a pit using a silver price of about $70 Aussie. So, we're talking about $48 uh US”
Michael Wallace· 24 Mar 2026·
price assumption
$80 USD spot; $60 USD long-term consensus; $70 AUD ($48 USD) for pit design
“We did one at spot at the time which about 80 US and one at consensus long-term consensus which closer to 60 US...We designed a pit using a silver price of about $70 Aussie.”
Unknown speaker· 24 Mar 2026·

Financing 2

Key takeaway. Management says Investigator Silver is well funded and moving into execution and development, aiming for a final investment decision in March 2026.

Read the full summary

The company reports that the project's capital requirements are sized to be financeable, and the construction period is designed for two years.

What was actually said
capital needed
sized to be financeable; designed with 2-year construction period
“We really did not size this operation to maximize headline MPV. We resized it to be financable.”
Unknown speaker· 24 Mar 2026·
financing status
Well funded, moving into execution and development toward FID
“We are well funded and moving into execution and development.”
Michael Wallace· 24 Mar 2026·

Timeline 6 statements

Timeline 4

Key takeaway. Investor Silver management outlined a timeline anchored to a March 2026 financing decision.

Read the full summary

They said they are moving toward a final investment decision (FID) and into the execution phase, and that a drill rig is heading out next week to expand pit drilling into currently inferred areas to the north, south and east. Management also plans a detailed, high-density drill-out—tightening spacing from 25 m to 12.5 m—in areas to be mined in the first three years, intended to support confidence around debt repayment. From financing, they anticipate a two-year construction period leading to first production.

What was actually said
construction start
Moving toward FID and into execution phase
“We are well funded and moving into execution and development”
Michael Wallace· 24 Mar 2026·
first production
2 year construction period from financing
“about a 11 year mine life of which nine of that was actually mining and two of construction”
Unknown speaker· 24 Mar 2026·
milestone
Drill rig heading out next week to expand pit drilling north, south and east in currently inferred areas
“We have a drill rig heading out there in fact next week um to start drilling out some of these areas with view to increase the um data density”
Michael Wallace· 24 Mar 2026·
Show the other 1 statement
milestone
Detailed drill out of high-density drilling (reducing from 25 m to 12.5 m spacing) in first 3 years mining areas to support debt repayment confidence
“we're going to be doing here is doing a detailed drill out. So highdensity drilling within the areas of the pit that uh are really focused for the first 3 years of mining. This is where the majority of the debt repayments will occur from.”
Michael Wallace· 24 Mar 2026·

Catalysts 2

Key takeaway. Management says the company's upcoming catalysts include a drilling program starting next week focused on pit optimization areas, with a detailed drill out of high-grade zones for the first three years and expansion drilling planned for…

Read the full summary

March 2026. The next major milestone after that is the Final Investment Decision (FID), also expected in March 2026.

What was actually said
next milestone
FID (Final Investment Decision)
“now lead it into I guess the execution as we work through to FID.”
Unknown speaker· 24 Mar 2026·
upcoming milestone
Drilling program starting next week on pit optimization areas; detailed drill out of high-grade zones for first 3 years; expansion drilling
“We have a drill rig heading out there in fact next week um to start drilling out some of these areas”
Unknown speaker· 24 Mar 2026·

Corporate 4 statements

Management 4

Key takeaway. Management says its track record is anchored by the team's leadership of the KMT underground mine, which was taken from early exploration through permitting, funding, development and into free cash generation "on time and on budget,"…

Read the full summary

finishing around 2024. The company notes that Michael Wallace joined about seven to eight months ago as CEO and MD, having previously led Hilro Resources and overseen the same KMT progression. The broader team is described as small — management plus four geologists — with plans to add people who have a South Australian presence and operational experience from development through steady-state operations.

What was actually said
team experience
Small team of myself and four geologists; building out with people with South Australian presence and operational experience from development through steady state operations
“So at the moment our team is relatively small as myself and um four you know really competent um geologists and now what we're starting to do with the DFS out and uh obviously the funding putting us in a really nice position to be able to build that starting to build out the team.”
Michael Wallace· 24 Mar 2026·
team experience
Small team of 4 geologists plus management; targeting people with South Australian presence and operations experience from development through steady state
“So at the moment our team is relatively small as myself and um four you know really competent um geologists...targeting people that we've worked with before, particularly with that South Australian presence”
Unknown speaker· 24 Mar 2026·
track record
Led KMT underground mine from early exploration through permitting, funding, development into free cash generation, on time and on budget, finished around 2024
“I was the CEO and MD of Hilro Resources and we built the KMT underground mine...led that from early stage uh exploration through the permitting funding development uh into free cash generation on time on budget”
Unknown speaker· 24 Mar 2026·
Show the other 1 statement
track record
Michael Wallace joined 7-8 months ago; previously CEO and MD of Hilro Resources, led KMT underground mine from exploration through development into free cash generation on time on budget, finished in 2024
“I joined investigator around 7 8 months ago. Uh prior to that I was the CEO and MD of Hilro Resources and we built the KMT underground mine. I basically led that from early stage uh exploration through the permitting funding development uh into free cash generation on time on budget and that sort of finished up in around 2024”
Michael Wallace· 24 Mar 2026·

Sources 1 interview

Every interview 1

DateChannelInterviewStatements
24 Mar 2026 Crux Investor Investigator Silver (ASX:IVR)- Australian Silver Developer Advances to Financing 43

What else those interviews covered

Every other asset named in the same recordings, by how many of them named it — the company's coverage context, not its holdings. Where the name is another company we hold a record for, it links to it.

gold 1
jupiter asset management 1
paris silver project 1
silver 1

Questions people ask

What is Investigator Silver's project and where is it?

Investigator Silver is a developer silver company, with a project stated to be in Australia. Everything here is drawn from its executives' own interviews.

Which interviews mention Investigator Silver?

We track 1 interview mentioning Investigator Silver, across 1 channel (Crux Investor).

What are investors saying about Investigator Silver?

No independent commentary is on record yet — so far the page carries only the company's own voice.

What do recent interviews with Investigator Silver cover?

The most-discussed topics on record are the deposit, economics, timeline, management — each claim quoted and dated in the sections above.

How to read this page

What is here

Statements made by company representatives in the interviews listed above — each one carrying the words that made it, the date, and the recording. Nothing is added from any other source: if it was not said on a recording, it is not on this page. The one exception lives in the Claims & Checks record, which cites a metal price from our own feed so a stated cost can be set against it — and labels it as ours wherever it appears.

What is not verified

All of it. Resource figures, economics, timelines and promotional framing are management's own representations, checked against no filing and no technical report. Transcripts are automatic; we repair a clearly mis-heard word but never a number, a date, a unit or a speaker's hedge — “about 8.6 million ounces” keeps its “about”.

How to use it

Treat it as a map of what has been said, not as a source of fact. Where a figure matters to you, open the recording and read the company's filings. Nothing here is financial advice, a recommendation, or an offer to buy or sell any security — these are interested parties discussing their own company.

Workspace Intelligence
YOUR AGENT
Investigation
Open the latest investigation, or start a new one from the left.

Notice

Loading…