Copper developer, with a project stated to be in Southwestern Africa.

NoneNamibia — as stated on the recordings

developer copper NoneNamibia
Mar 2026 → Jun 2026Covered
8 of 10Topics on record
1 executiveNamed on the record
Generate Claims & Checks What management and commentators said, and what still needs independent verification 2 interviews with the company
Stage
Developer
Primary commodity
Copper
Jurisdiction
Southwestern Africa
Deposit
porphyry copper molybdenum and some gold project
Latest appearance
08 Jun 2026
On record
2 interviews · 32 statements · 1 executive

At a glance

What the record holds today. Every card names where it came from — a management representation is not an established fact, and the page never blurs the two.

Grade
roughly just under 0.5% copper equivalent after 10 years of mining with CPF pre-sorting
Management-stated Heye Daun Jun 2026
Capital needed
$1.5 billion capex
Management-stated Mar 2026
What happens next
drilling with 14 rigs ongoing to de-risk project
Management-stated Heye Daun Jun 2026
The main open question
The deposit is low-grade sulfide requiring novel coarse particle flotation (CPF) at scale — technology not yet proven at production rates needed to hit 120,000 tons copper annually [1, 15].
Weighed from the statements below, not our opinion of the company.
Our reading

Management view vs outside view

Management interviews are promotional by nature; the outside view is the counterweight. Both are quoted from the recordings, not added by us.

What management spends its time on

Counted from Koryx Copper's own claims across 2 interviews — most-covered theme first.

What outside voices pick up on

No independent commentary on record yet — so far the page carries only the company's own voice.

Bull · Bear · Watch next

Weighed from the statements on this page — management's pitch and the outside view. Not financial advice, and not our opinion of the company.

▲ Bull case

Management says the team has a proven track record selling advanced projects for $200M+ in Namibia and recently exited Oino Resources to a Chinese buyer.

What it rests on
Evidence: 3 moments from 1 interview
Read the full case

Management says the team has a proven track record selling advanced projects for $200M+ in Namibia and recently exited Oino Resources to a Chinese buyer. The company has raised sufficient capital [26], permits largely in place [4], and a large sulfide deposit with extraction economics improving through flowsheet enhancements — targeting over 100,000 tons annually at conservative $430/lb assumptions and a capital-efficient $1.5B capex [12, 18]. PFS delivers expected within months [21], with drilling and study work positioned to unlock a middle-of-cost-curve producer.

▼ Bear case

The deposit is low-grade sulfide requiring novel coarse particle flotation (CPF) at scale — technology not yet proven at production rates needed to hit 120,000 tons copper annually [1, 15].

What it rests on
Evidence: 3 moments from 2 interviews
Read the full case

The deposit is low-grade sulfide requiring novel coarse particle flotation (CPF) at scale — technology not yet proven at production rates needed to hit 120,000 tons copper annually [1, 15]. The project depends on executing a $1.5B capex in Namibia with flowsheet assumptions that differ from the previous operator's approach [32]; permitting is claimed "largely in place" but PFS timing suggests study work still incomplete [4, 7, 21]. No independent technical or financial validation; material assumes higher grades and cost improvements that hinge on ongoing drilling outcomes [2, 30].

◆ Watch next

PFS publication expected by end of this year [21] — the first independent test of whether CPF flowsheet enhancements and improved resource model translate to buildable economics.

What it rests on
Evidence: 2 moments from 2 interviews
Read the full case

PFS publication expected by end of this year [21] — the first independent test of whether CPF flowsheet enhancements and improved resource model translate to buildable economics. Completion of 14-rig drilling program [3] and its impact on resource grade and confidence intervals. Strategic offtake and financing discussions with Chinese and international groups [27] — whether non-dilutive capital or credible offtake agreements materialize before capex approval, signaling market confidence in the final study.

Each moment links to the exact point in the source recording. The cases are drawn from the transcripts, weighed as written — they are not a rating, a target or a recommendation.

Project 15 statements

The deposit 5

Key takeaway. Management describes the deposit as a large, low-grade sulfide copper deposit (March 2026), and more recently as a porphyry copper-molybdenum project with some gold (June 2026).

Read the full summary

The company reports a grade of roughly just under 0.5% copper equivalent after 10 years of mining using CPF pre-sorting. On exploration upside, the CEO said in March that "if you drill the hell out of it, generally speaking, you can improve things a bit," while in June management cited an improved resource model showing higher-grade introduction of byproducts.

What was actually said
deposit type
porphyry copper molybdenum and some gold project
“fast advancing uh developer of a large pfery copper malipinum and some gold project in Namibia”
Heye Daun· 08 Jun 2026·
exploration upside
improved resource model showing higher grade introduction of byproducts
“Improved resource means higher grade introduction of byproducts more constraining just better stuff in the grant”
Heye Daun· 08 Jun 2026·
grade
roughly just under 0.5% copper equivalent after 10 years of mining with CPF pre-sorting
“so therefore you crush 100 25 gets rejected and 75 goes into the main processing plant obviously then at much higher grade”
Heye Daun· 08 Jun 2026·
Show the other 2 statements
deposit type
Sulfide copper deposit. Low grade. Large.
“It's sulfide only, a bit more complex, not oxide. if you've got a project that's low grade. you know it has size. Size is everything.”
04 Mar 2026·
exploration upside
If you drill the hell out of it, generally speaking, you can improve things a bit.
“If you've got a project that's low grade, if you drill the hell out of it, generally speaking, you can improve things a bit.”
04 Mar 2026·

Jurisdiction 5

Key takeaway. Management highlights Namibia's political stability and established mining industry.

Read the full summary

In March 2026, the company described Namibia as "very stable" with no civil wars, no Kalashnikovs, and a stable tax code and minerals regime, noting it became independent in 1990 and has had a well-established mining industry ever since. By June 2026, the company reported that the permits needed for a shovel-ready project are "largely in place."

What was actually said
country
Namibia
“developer of a large pfery copper malipinum and some gold project in Namibia”
Heye Daun· 08 Jun 2026·
permit status
permits largely in place needed for shovel ready project
“credible study, utility questions answered and permits largely in place. That's what we focus on.”
Heye Daun· 08 Jun 2026·
country
Namibia
“developing, advancing, de-risking the large hype copper pfury project in Namibia.”
04 Mar 2026·
Show the other 2 statements
political risk
Namibia is very stable. No civil wars, no diseases, no kalashnikovs, no Ebola virus. Got a very stable um tax code and minerals regime. It's been a democracy. It became independent in 1990. Has had a very well established mining industry all along.
“Namibia is in southwestern Africa. Um, it's in Africa, but it doesn't have any of the problems that that people normally associate with Africa. So, it's very stable. No civil wars, no diseases, no kalashnikovs, no Ebola virus, none of that. Um, it's got a very stable um tax code and minerals regime. It's been a democracy. It became independent in 1990. And it's got it has had a very well established mining industry all along.”
04 Mar 2026·
region
Southwestern Africa
“Namibia is in southwestern Africa.”
04 Mar 2026·

Technical risk 5

Key takeaway. Management says the project's technical risk has been reduced by switching from bioleaching to conventional milling and flotation.

Read the full summary

According to the company, the previous heap-leach approach was too risky for sulfides because "if the bugs die (passivation), the heap is toast." The new flowsheet adds CPF pre-sorting and coarse particle flotation to treat low-grade material, achieving about 25% rejection at about 4 to 8% copper losses. That said, management also noted in March 2026 that even conventional milling and flotation might only work if the company drills extensively, does good-quality work, and copper prices rise.

What was actually said
key assumption
flowsheet enhancements including CPF coarse particle flotation to treat low grade material
“through flowheet enhancements. So we spent a lot of time there's a lot of detail in that press release explaining the flowheet enhancements”
Heye Daun· 08 Jun 2026·
metallurgy
sulfide deposit processed through milling and flotation with CPF pre-sorting, removing heat leaching
“Um but we're not an oxide. So therefore, heat bleach out the question. We're a sulfite. We have to deal with it.”
Heye Daun· 08 Jun 2026·
recovery rate
about 25% rejection at about 4 to 8% copper losses
“able to reject about 25% um at at at about 4 to8% copper losses. So it's minimal copper losses and 25% rejection”
Heye Daun· 08 Jun 2026·
Show the other 2 statements
key assumption
If you drill the hell out of it and do good quality work plus higher copper prices, maybe it can fly with conventional milling and flotation.
“If you've got a project that's low grade, if you drill the hell out of it, generally speaking, you can improve things a bit. And if you do good quality work plus higher copper prices, maybe it can fly with conventional milling and flotation, which is what this needs.”
04 Mar 2026·
metallurgy
Changed from bioleaching to conventional milling and flotation. Previous proposal to use heap leaching was too risky for sulfides because if the bugs die (passivation), the heap is toast.
“The previous company published a pea. which which proposed biolleaching for the sulfide project which sounds good in theory but it's the wrong processing group because it's not it can't it it hasn't been proven at large scale. Basically, what happens is you put it on the heap and and if the bugs die, the experts call it pacivation, then what do you do? Then your heap is toast.”
04 Mar 2026·

Economics 6 statements

Economics 5

Key takeaway. Koryx Copper's management has shared preliminary project economics with varying figures across two interviews.

Read the full summary

In March 2026, the company reported a $1.5 billion capex and a price assumption of $4.30 per pound (about $9,500 per ton). By June 2026, management was targeting annual copper production north of 100,000 tons, ideally around 120,000 tons, and noted their price assumptions are conservative at 30% below spot or the analyst forward curve. Regarding costs, management said in March 2026 that all-in sustaining costs and capital intensity place the project in the middle of the cost curve.

What was actually said
annual production
north of 100,000 tons of copper production per year, hopefully around 120,000 tons
“It's going to be north of 100,000 tons of copper production per year, hopefully around 120,000 tons of copper production”
Heye Daun· 08 Jun 2026·
price assumption
conservative assumptions 30% below spot or analyst forward curve
“using conservative metal price assumptions that say 30% below spot or whatever we use the analyst forward curve”
Heye Daun· 08 Jun 2026·
aisc
All in sustaining costs, good capital intensity, middle of the cost curve
“$ 1.5 billion capex, middle of the cost curve, all in sustaining costs, good capital intensity, etc.”
04 Mar 2026·
Show the other 2 statements
capex
$1.5 billion capex
“They couldn't in serious in all seriousness propose a $1.5 billion capex project, which is what we've done.”
04 Mar 2026·
price assumption
$430 per pound which is uh like 9,500 per ton
“we did the PA at $430 per pound which is uh like 9,500 per ton.”
04 Mar 2026·

Financing 1

What was actually said
capital needed
We've raised enough money. We don't need anyone else right now.
“We've raised enough money. We don't need anyone else right now.”
04 Mar 2026·

Timeline 5 statements

Timeline 5

Key takeaway. Management says the company aims to deliver a Preliminary Feasibility Study (PFS) by the end of 2026, following a PEA published late last year and a Prefeasibility Assessment from 2025.

Read the full summary

As of March 2026, the company reported 12 rigs drilling on site; by June 2026, that had grown to 14 rigs, with management describing the drilling as ongoing work to de-risk the project. The CEO also stated in June that an organic re-rating is expected as execution unfolds over the next 6 to 12 months.

What was actually said
milestone
drilling with 14 rigs ongoing to de-risk project
“Drill, drill, drill. We say the the best thing we can do at the moment is drill as much as we can. We're drilling as much as we can. 14 rigs.”
Heye Daun· 08 Jun 2026·
milestone
PFS (Preliminary Feasibility Study) coming up, PA (Prefeasibility Assessment) from last year
“you're looking at um you know PA from last year and PFS presumably coming up”
Heye Daun· 08 Jun 2026·
milestone
organic rerate with execution expected over next 6 to 12 months
“that opportunity is the one as we execute and remove uncertainty over the next 6 to 12 months”
Heye Daun· 08 Jun 2026·
Show the other 2 statements
milestone
Published a PEA last year, end of last year. Now doing a PFS. Have 12 rigs on site doing drilling.
“we then did the pea which we published last year, end of last year. got 12 rigs on site, did a PA, busy with the PFS”
04 Mar 2026·
study due
PFS by end of this year
“what's the timing on that PF? >> End of this year.”
04 Mar 2026·

Corporate 6 statements

Management 3

Key takeaway. Management points to its track record: the same team took over Koryx's project two years ago with a strategy to refinance, put the right team in place, optimize and deliver (Jun 2026).

Read the full summary

Earlier they sold a project in Namibia to B2Gold, which built a successful gold mine from it, and founded Oino Resources from scratch, made a discovery, and sold it to a Chinese group in 2024 (Mar 2026). The company describes its team as a world-class exploration and study group expert at identifying, acquiring, advancing, de-risking and pushing projects forward (Mar 2026).

What was actually said
track record
took over project two years ago, strategy to refinance, put right team in place, optimize and deliver
“when we took it over two years ago we said our strategy would be refinance it put the right team in place”
Heye Daun· 08 Jun 2026·
team experience
World-class exploration and study group. Experts at identifying, acquiring advancing de-risking pushing projects forward.
“my band is really a world-class group. a world-class exploration and study group. We are experts at identifying, acquiring advancing de-risking pushing projects forward.”
04 Mar 2026·
track record
Sold project in Namibia to B2 Gold acquired at advanced its soldier to be gold for $200 million in 2011. They built a very successful gold mine. Formed Oino Resources, started from nothing made a discovery, sold it to a Chinese group in 2024 who are now b
“sold the project in Namibia to B2 Gold. acquired at advanced its soldier to be gold for $200 million in 2011. They built a very successful gold mine. formed another company in Namibia. called Oino Resources which started from nothing made a discovery and over a period of about seven years did various technical studies and in the end sold it to a Chinese group in 2024 who are now um building that mine”
04 Mar 2026·

Market 3

Key takeaway. Management says Koryx Copper's project currently sits in the middle of the cost curve, which the company expects will improve to the second quartile by June 2026.

Read the full summary

According to the CEO's March 2026 comments, Chinese groups and various other parties have recognized the project's viability, and all major off-takers are now in discussions with the company.

What was actually said
cost curve position
sitting in the middle of the cost curve, expected to move down into the second quartile
“this project at the moment is sitting in the middle of the cost curve. Um, and I expect with these increased production numbers etc. we will move down that cost curve well into the second cordal”
Heye Daun· 08 Jun 2026·
cost curve position
Middle of the cost curve
“$ 1.5 billion capex, middle of the cost curve, all in sustaining costs, good capital intensity, etc.”
04 Mar 2026·
strategic interest
Chinese and various other groups have realized that this project is for real. All the major off takers are talking to us.
“the Chinese and various other groups have realized that this project is for real. Um, and and that's why they knocking on the door. all the major off takers are talking to us.”
04 Mar 2026·

Sources 2 interviews

Every interview 2

DateChannelInterviewStatements
08 Jun 2026 Crux Investor Koryx Copper (TSXV:KRY) - Namibia's Giant Copper Deposit Gets a Major Upgrade 15
04 Mar 2026 Crux Investor Koryx Copper Inc. (TSXV:KRY) - Institutional Capital Backs Haib Development - PFS By Year End 17

What else those interviews covered

Every other asset named in the same recordings, by how many of them named it — the company's coverage context, not its holdings. Where the name is another company we hold a record for, it links to it.

copper 2
b2gold 1
bingham canyon 1
camoa kakula 1
coarse particle flotation 1
glencore 1
gold 1
haib copper project 1

Questions people ask

What is Koryx Copper's project and where is it?

Koryx Copper is a developer copper company, with a project stated to be in Namibia. Everything here is drawn from its executives' own interviews.

Which interviews mention Koryx Copper?

We track 2 interviews mentioning Koryx Copper, across 1 channel (Crux Investor).

What are investors saying about Koryx Copper?

No independent commentary is on record yet — so far the page carries only the company's own voice.

What do recent interviews with Koryx Copper cover?

The most-discussed topics on record are the deposit, economics, timeline, jurisdiction — each claim quoted and dated in the sections above.

How to read this page

What is here

Statements made by company representatives in the interviews listed above — each one carrying the words that made it, the date, and the recording. Nothing is added from any other source: if it was not said on a recording, it is not on this page. The one exception lives in the Claims & Checks record, which cites a metal price from our own feed so a stated cost can be set against it — and labels it as ours wherever it appears.

What is not verified

All of it. Resource figures, economics, timelines and promotional framing are management's own representations, checked against no filing and no technical report. Transcripts are automatic; we repair a clearly mis-heard word but never a number, a date, a unit or a speaker's hedge — “about 8.6 million ounces” keeps its “about”.

How to use it

Treat it as a map of what has been said, not as a source of fact. Where a figure matters to you, open the recording and read the company's filings. Nothing here is financial advice, a recommendation, or an offer to buy or sell any security — these are interested parties discussing their own company.