Project 24 statements
The deposit 13
Key takeaway. Management describes the deposit as an open-pit copper-gold project (Feb, Apr, Jul 2026).
Read the full summary
They report a 200-million-ton open-pit resource (Jul 2025), with about 8 million tons of ore to be processed (Feb 2026) and a processing plan of about 8 million tons (Apr 2026). On grade, the company cites 0.61% copper with more than 1% in a central high-grade core area (Jul 2026), and notes grades potentially 0.7 or even 0.8 on a mineralization trend from the Silica Cap pit trending southeast into the Atlantica license (Apr 2026).
Show the other 10 statements
Jurisdiction 7
Key takeaway. Management of Lara Exploration highlights that the company's projects are located in Brazil, specifically in the Carajás region (Jul 2025, Feb 2026, Jul 2026).
Read the full summary
As of Jul 2025, the company reports that the site has no primary forest, no First Nations presence, and no monuments, which management characterizes as favourable for permitting.
Show the other 4 statements
Technical risk 4
Key takeaway. Regarding technical risk at the project, management points to favourable metallurgy, reporting that the chalcopyrite minerals "float incredibly well" and produce a 29% concentrate with no penalties (July 2025).
Read the full summary
The company also assumes that copper on the surface in soil samples is a good indicator of copper below (April 2026). A phase three metallurgical program is planned for July 2026. On the water side, management says the key assumption is about 2 metres of rainfall each year and that water management is critical (July 2026).
Show the other 1 statement
Economics 17 statements
Economics 8
Key takeaway. Management has discussed project economics on several occasions, with figures that vary based on the copper price assumed.
Read the full summary
In February 2026 the company reported an NPV of $380 million at a copper price of $9,500 per ton, and an NPV of $1.2 billion at $13,000 per ton, with an IRR of about 21% at the $9,500 level and 40% plus at the then-current copper price. By April 2026, management noted that the prior preliminary assessment had used $9,500 copper, while the metal was then trading at $6 (July 2026). The company also cited an all-in sustaining cost that is "pretty pretty low" and an energy cost of 6 cents per kilowatt hour, with a capex budget of about $6.5 million to drill out the first parts of the pit and complete some technical studies.
Show the other 5 statements
Financing 9
Key takeaway. On financing, management's comments span several dates and show a shifting picture.
Read the full summary
In July 2025 the company reported just under $4 million in cash, no debt, and roughly $10 million already spent by partner Capstone on de-risking. By April 2026 the cash position had risen to over $33 million Canadian, with management stating capital needed of about US $25 million (or Canadian $33 million). In July 2026 management reiterated that about US $25 million in capital is needed. Separately, the company noted in February 2026 that it has never done a rollback or consolidation in nearly 18 years, and at that time reported $3.5 million in treasury with a burn rate of less than $1 million Canadian.
Show the other 6 statements
Timeline 10 statements
Timeline 7
Key takeaway. Management has described a stepped timeline for the project.
Read the full summary
As of July 2026, they reported that the environmental impact study was completed towards the end of the year and they were filing for the first environmental permit, noting that the permit review including public consultation takes about a year. Earlier, in April 2026, the company said it planned to spend "a good 10 million" on a pre-feasibility study and drill-out over the following 12 months. A preliminary economic assessment was released in November of the prior year, and as of July 2025 management said a "PA" (presumably a preliminary assessment) would probably come out in autumn.
Show the other 4 statements
Catalysts 3
Key takeaway. Regarding upcoming catalysts, management has pointed to several milestones across different dates.
Read the full summary
As of April 2026, the company said it expects drilling results over the next two to three months. In a July 2026 update, management added that a batch of drill holes and an updated resource estimate are upcoming, and that the company plans to file for its first environmental permit towards the end of the year.
Corporate 15 statements
Management 7
Key takeaway. Management emphasises its track record and team experience.
Read the full summary
The company reports it has operated as a prospect generator for 18 years without any rollbacks (Jul 2025). Management says Simon Ingram was President and CEO of Reservoir Minerals, which went public at 65 cents and was exited at $9.40, creating $500 million of value (Feb 2026). The company also reports discovering the Timot project in Serbia—described as the 13th largest copper discovery in the last 30 years—which was sold for $940 million (Jul 2025). Management notes nearly 20% insider ownership, with founder Miles Thompson holding 10% (Jul 2025), and states that Thompson, along with VP of Corporate Development Chris Macintosh, were part of the Reservoir Minerals team (Feb 2026).
Show the other 4 statements
Market 1
Outside views 3 mentions
3 mentions by people who do not speak for the company — 2 constructive, 0 cautious, 0 neutral. These are their views, not the company's.
Sources 4 interviews
Every interview 4
| Date | Channel | Interview | Statements |
|---|---|---|---|
| 06 Jul 2026 | MiningStockEducation.com | Planalto Copper-Gold Deposit’s Pre-Feasibility Pathway with Lara Exploration CEO Simon Ingram | 14 |
| 13 Apr 2026 | MiningStockEducation.com | “Our Planalto Copper Project will be a Mine” explains Lara Exploration CEO Simon Ingram | 13 |
| 16 Feb 2026 | MiningStockEducation.com | Developing Brazil’s Next Copper Mine with Lara Exploration CEO Simon Ingram | 20 |
| 24 Jul 2025 | In it to Win it | $500M Copper Discovery? Lara Exploration’s Planalto Project! | 19 |
What else those interviews covered
Every other asset named in the same recordings, by how many of them named it — the company's coverage context, not its holdings. Where the name is another company we hold a record for, it links to it.
Questions people ask
What is Lara Exploration's project and where is it?
Lara Exploration is a developer copper company, with a project stated to be in Brazil. Everything here is drawn from its executives' own interviews.
Which interviews mention Lara Exploration?
We track 4 interviews mentioning Lara Exploration, across 2 channels (In it to Win it, MiningStockEducation.com).
What are investors saying about Lara Exploration?
3 independent voices — people who do not speak for the company — are on record discussing it (2 bullish). Their reasoning is quoted in the outside-view section above.
What do recent interviews with Lara Exploration cover?
The most-discussed topics on record are the deposit, financing, economics, timeline — each claim quoted and dated in the sections above.