← Back to TranscriptAgent TranscriptAgent
← All mining companies

Radisson Mining ResourcesTSXV:RDS

Gold explorer, with a project stated to be in Epatib region of Quebec.

Quebec · Canada — as stated on the recordings

explorer gold Quebec, Canada
Oct 2025 → Jul 2026Covered
9 of 10Topics on record
6Figures tracked over time
1 executiveNamed on the record
Generate Claims & Checks What management and commentators said, and what still needs independent verification 4 interviews with the company · 1 independent recording
Stage
Explorer
Primary commodity
Gold
Jurisdiction
Epatib region of Quebec
Deposit
high-grade, narrow vein mining situation
Latest appearance
08 Jul 2026
On record
4 interviews · 60 statements · 1 executive

At a glance

What the record holds today. Every card names where it came from — a management representation is not an established fact, and the page never blurs the two.

What is in the ground
about 2.3 million ounces as of March
Management-stated Matt Manson Jul 2026
Grade
half an ounce average grade from old mine; main vein double digit grade; parallel structures 6, 7, 8 grams
Management-stated Matt Manson Mar 2026
Money on hand
25 million raised in October
Stated capital need: $25 million raised in May
Management-stated Matt Manson Mar 2026
What happens next
140,000 meter drill program started in October, 72,000 m this year and first half of next year
Management-stated Matt Manson Jul 2026
The main open question
The resource estimate rests on the assumption that high-grade mineralization continues to 2 km depth—unproven at scale.
Weighed from the statements below, not our opinion of the company.
Our reading
How outsiders read it
1 independent voice on record — 1 constructive
David Christie
Outside voices

How the stated figures have moved

The same figure, as management put it on the earliest and the latest recording we hold. A difference may be a genuine update, a different measure of the same thing (total against indicated), or a mis-heard number — both quotes are here, and both recordings are one click away.

Capital needed ≠ Different basis One statement qualifies the figure and the other does not (raised) 4 statements on record
09 Oct 2025
175 Canadian million
“So we estimate that in this recent mining study to be 175 Canadian million that's all.”
08 Jul 2026
$25 million raised in May
“at the time of raising that money in May and on on the the $25 million in May, we announced”
Cash position $35 million25 million ≠ Different basis One statement qualifies the figure and the other does not (raised) 2 statements on record
21 Oct 2025
$35 million in the bank
“$35 million in the bank. That funds us all the way through this year, all the way through next year”
05 Mar 2026
25 million raised in October
“We raised 25 million in October, upsized the program to 140,000 meters”
Resource size ? New figure The earlier statement put no number on this 6 statements on record
09 Oct 2025
about a million and a half ounces high grade
“On the eastern side, there's a new resource now. It's about a million and a half ounces high grade currently and it's growing.”
08 Jul 2026
1.5 million ounces previously; 900,000 ounces back in 2023
“it was 1.5 previously and and you know back in 23 it was 900,000 ounces.”
Grade ? New figure The earlier statement put no number on this 2 statements on record
09 Oct 2025
half an ounce head
“Oh, well the original mine was half an ounce head.”
05 Mar 2026
half an ounce average grade from old mine; main vein double digit grade; parallel structures 6, 7, 8 grams
“the old-timers mine half an ounce average grade, right... that's double digit grade every time we hit it.”
NPV ? New figure The earlier statement put no number on this 2 statements on record
09 Oct 2025
like a half a billion dollar MPV
“Which is just 740,000 ounces. So just a small subset we get like a half a billion dollar MPV which is three times the capital which is a metric which is a good measuring stick.”
21 Oct 2025
$532 million NPV at 2550 gold
“The pea that we put out $532 million NPV at 2550 gold.”
Operating cost ? Wording changed One statement carries no figure to compare 2 statements on record
09 Oct 2025
minimal surface facilities and a water treatment plant
“and minimal surface facilities and a water treatment plant for mine water coming out the mine.”
21 Oct 2025
very low cost
“very low capital very low cost of entry for this type of mine development”

Management view vs outside view

Management interviews are promotional by nature; the outside view is the counterweight. Both are quoted from the recordings, not added by us.

What management spends its time on

Counted from Radisson Mining Resources's own claims across 4 interviews — most-covered theme first.

What outside voices pick up on

1 independent voice — people who do not speak for the company — across 1 mention.

1 constructive
  • David Christie “O'Brien project operator; 140,000m drill program; just announced significant resource increase, which benefits Globex's royalty.”

Bull · Bear · Watch next

Weighed from the statements on this page — management's pitch and the outside view. Not financial advice, and not our opinion of the company.

▲ Bull case

Management says the deposit has grown to 2.3 million ounces in March from 900,000 in 2023, with a high-grade main vein and upside to 3–4 million ounces at depth.

What it rests on
Evidence: 3 moments from 2 interviews
Read the full case

Management says the deposit has grown to 2.3 million ounces in March from 900,000 in 2023, with a high-grade main vein and upside to 3–4 million ounces at depth. At just $2,000 gold, a preliminary economic assessment showed $532 million NPV, and the company has $35 million funded through 2025 and into 2026 on a low-cost, narrow-vein model. An outside investor noted the 140,000-meter drill program is delivering results, with a recent significant resource increase benefiting stakeholders.

▼ Bear case

The resource estimate rests on the assumption that high-grade mineralization continues to 2 km depth—unproven at scale.

What it rests on
Evidence: 2 moments from 1 interview
Read the full case

The resource estimate rests on the assumption that high-grade mineralization continues to 2 km depth—unproven at scale. Only 25% of the 140,000-meter program is complete; the 82% inferred resource jump is from early-stage drilling with an 84% hit rate that does not guarantee ore-body continuity or mining economics. The PEA used $2,000 gold and "very low" costs that may not reflect permitting delays, production risk, or the capital intensity of underground hard-rock mining in Quebec.

◆ Watch next

Resource update due end of 2025 after additional 72,500 meters drilled this year; final update mid-2027 as the 140,000-meter program concludes.

What it rests on
Evidence: 2 moments from 1 interview
Read the full case

Resource update due end of 2025 after additional 72,500 meters drilled this year; final update mid-2027 as the 140,000-meter program concludes. The critical test: does infill drilling confirm the 2 km depth assumption and maintain or improve the 3–4 million ounce target? Permitting path, cash burn rate, and gold price movement against the $2,000 PEA assumption are also key monitors.

Each moment links to the exact point in the source recording. The cases are drawn from the transcripts, weighed as written — they are not a rating, a target or a recommendation.

Project 31 statements

The deposit 18

Key takeaway. Management describes the deposit as a high-grade, narrow-vein underground mining situation with a big system of quartz sulfide veins, classifying it as a misothermal or orogenic gold deposit (Oct 2025, Mar 2026, Jul 2026).

Read the full summary

As of July 2026, the company reports about 2.3 million ounces combined indicated and inferred, up from 1.5 million ounces previously and from 900,000 ounces back in 2023; the March 2026 update had noted an 82% increase in inferred resources from the prior update. Management sees exploration upside of between 3 and 4 million ounces if the system fills in to the 2 km floor, with potential for upwards of 4 million ounces, and has also stated that the current resource supports an 11-year mine life (Mar 2026, Jul 2026). The CEO noted that the old mine averaged half an ounce, the main vein is double-digit grade, and parallel structures run 6, 7, or 8 grams (Mar 2026).

What was actually said
deposit type
high-grade, narrow vein mining situation
“this is a high-grade, you know, narrow vein mining situation, right?”
Matt Manson· 08 Jul 2026·
exploration upside
between 3 and 4 million ounces if it fills in to 2 km floor; upwards of 4 million ounces; potential for something upwards of 4 million ounces
“if it keeps on going down to a 2 km floor and it fills in on the same basis that it's filling in that's between 3 and 4 million ounces and it's upwards of 4 million ounces really.”
Matt Manson· 08 Jul 2026·
resource size
about 2.3 million ounces as of March
“we've got 2.3 million ounces as of March in all categories.”
Matt Manson· 08 Jul 2026·
Show the other 15 statements
resource size
1.5 million ounces previously; 900,000 ounces back in 2023
“it was 1.5 previously and and you know back in 23 it was 900,000 ounces.”
Matt Manson· 08 Jul 2026·
deposit type
big system of quartz sulfide veins
“this big system of quartz sulfide veins with lots of gold”
Matt Manson· 05 Mar 2026·
exploration upside
11-year mine life at current resource
“we've got an 11-year mine life there.”
Matt Manson· 05 Mar 2026·
exploration upside
82% increase in inferred resources from previous update
“82% increase in inferred resources.”
Matt Manson· 05 Mar 2026·
exploration upside
3 to 4 million ounce deposit
“we've guided the market previously that we think this is a 3 to 4 million deposit.”
Matt Manson· 05 Mar 2026·
grade
half an ounce average grade from old mine; main vein double digit grade; parallel structures 6, 7, 8 grams
“the old-timers mine half an ounce average grade, right... that's double digit grade every time we hit it.”
Matt Manson· 05 Mar 2026·
resource size
1.5 million ounces previous combined indicated inferred
“we had 1.5 million previously.”
Matt Manson· 05 Mar 2026·
resource size
2.3 million ounces combined indicated inferred
“we had 1.5 million previously. It's now 2.3.”
Matt Manson· 05 Mar 2026·
deposit type
underground mine
“being developed as an underground mine and being trucked to one of these adjacent mills”
Matt Manson· 21 Oct 2025·
exploration upside
between 3 and 4 million ounces in this deposit
“we believe on a targeted basis for looking statements applying here that we're looking at between 3 and 4 million ounces in this deposit.”
Matt Manson· 21 Oct 2025·
resource size
about a million and a half ounces
“The current resource is about a million and a half ounces.”
Matt Manson· 21 Oct 2025·
deposit type
misothermal gold deposit orenic gold
“So this is a what's called a misothermal gold deposit orenic gold another expression for it and the paradigm is that it keeps on going down.”
Matt Manson· 09 Oct 2025·
exploration upside
it's obviously getting bigger
“So we've yeah we've hit below the old mine, below the new resource, and it's obviously getting bigger”
Matt Manson· 09 Oct 2025·
grade
half an ounce head
“Oh, well the original mine was half an ounce head.”
Matt Manson· 09 Oct 2025·
resource size
about a million and a half ounces high grade
“On the eastern side, there's a new resource now. It's about a million and a half ounces high grade currently and it's growing.”
Matt Manson· 09 Oct 2025·

Jurisdiction 7

Key takeaway. Radisson Mining Resources is focused on projects in Quebec, Canada.

Read the full summary

Management has referred to the region inconsistently over time: as "Abatibi of Quebec" and "Cadillac of our Lake Break, Quebec" in October 2025, as "Abatibbe region of Quebec" in March 2026, and as the "Epatib region of Quebec" in July 2026.

What was actually said
country
Canada
“exploring and developing the O'Brien Gold Project in the Epatib region of Quebec”
Matt Manson· 08 Jul 2026·
region
Epatib region of Quebec
“exploring and developing the O'Brien Gold Project in the Epatib region of Quebec”
Matt Manson· 08 Jul 2026·
region
Abatibbe region of Quebec
“developing the O'Brien Gold Project in the Abatibbe region of Quebec”
Matt Manson· 05 Mar 2026·
Show the other 4 statements
country
Canada
“the heart of gold mining heritage in Quebec and Canada”
Matt Manson· 21 Oct 2025·
region
Abatibi of Quebec
“an historic former producing mine in the Abatibia of Quebec”
Matt Manson· 21 Oct 2025·
country
Canada
“Rison is the O'Brien Gold Project, a famous project in the history of gold mining in Quebec.”
Matt Manson· 09 Oct 2025·
region
Cadillac of our Lake Break, Quebec
“It's the Cadillac of our Lake Break. famous famous structure that lots of mines have been centered on.”
Matt Manson· 09 Oct 2025·

Technical risk 6

Key takeaway. Management of Radisson Mining Resources acknowledges technical risk from its key assumption that the deposit extends to depth.

Read the full summary

The company reports that only 25% of its 140,000-meter program has been completed but has already delivered an 82% resource increase, with an 84% success rate on stepout drilling. However, management has stated at different times that the deposit is assumed to continue to either a 2-kilometer floor (stated in March 2026 and again in October 2025) or to 2.5 kilometers depth (stated in July 2026), and that the risk is whether "it keeps on going down."

What was actually said
key assumption
deposit continues to 2.5 kilometers depth
“at the time of raising that money in May and on on the the $25 million in May, we announced that we were actually going to go be below 2 km. We're going to go to 2 and a half kilometers”
Matt Manson· 08 Jul 2026·
key assumption
mineralization continues to 2 km floor
“based upon this style of mineralization continuing to that 2 km floor”
Matt Manson· 05 Mar 2026·
recovery rate
84% success rate on stepout drilling
“We're hitting with an 84% success rate.”
Matt Manson· 05 Mar 2026·
Show the other 3 statements
stated risk
25% of 140,000 meter program completed delivering 82% resource increase
“we've only completed 25% of this 140,000 meter program and so that's delivering an 82% increase in the inferred resources.”
Matt Manson· 05 Mar 2026·
key assumption
if this continues to 2 km, which we think is the floor of our exploration
“If this continues to 2 km, which we think is the floor of our exploration”
Matt Manson· 21 Oct 2025·
key assumption
it keeps on going down
“So this is a what's called a misothermal gold deposit orenic gold another expression for it and the paradigm is that it keeps on going down.”
Matt Manson· 09 Oct 2025·

Economics 13 statements

Economics 7

Key takeaway. In October 2025, Radisson Mining Resources management discussed project economics, though their figures appear to reference different gold-price assumptions.

Read the full summary

The company cited a $532 million NPV at $2,550 gold and separately mentioned "like a half a billion dollar" NPV; the mine design itself assumed $2,000 gold, while $2,500 gold was also referenced. Management described operating costs as "very low," noting minimal surface facilities and a water treatment plant, and put initial capex at C$175 million.

What was actually said
npv
$532 million NPV at 2550 gold
“The pea that we put out $532 million NPV at 2550 gold.”
Matt Manson· 21 Oct 2025·
operating cost
very low cost
“very low capital very low cost of entry for this type of mine development”
Matt Manson· 21 Oct 2025·
price assumption
$2,000 gold in the mine design
“This used just $2,000 gold in the mine design and the mineral resource.”
Matt Manson· 21 Oct 2025·
Show the other 4 statements
capex
175 Canadian million
“So we estimate that in this recent mining study to be 175 Canadian million that's all.”
Matt Manson· 09 Oct 2025·
npv
like a half a billion dollar MPV
“Which is just 740,000 ounces. So just a small subset we get like a half a billion dollar MPV which is three times the capital which is a metric which is a good measuring stick.”
Matt Manson· 09 Oct 2025·
operating cost
minimal surface facilities and a water treatment plant
“and minimal surface facilities and a water treatment plant for mine water coming out the mine.”
Matt Manson· 09 Oct 2025·
price assumption
$2,500 gold
“And you know and the MPV of the project in this recent mining study at $2,500 gold just using a subset of the existing resource.”
Matt Manson· 09 Oct 2025·

Financing 6

Key takeaway. Radisson Mining's management has discussed financing on several occasions, with figures that have shifted over time.

Read the full summary

In October 2025, the company said it had $35 million in the bank, described its project as requiring "low initial capital," and pegged total needs at "175 Canadian million." By March 2026, management was reporting $25 million raised in October and a 140,000 meter drilling program as the use of those funds. In July 2026, it said a further $25 million was raised in May, though it did not state the resulting cash balance.

What was actually said
capital needed
$25 million raised in May
“at the time of raising that money in May and on on the the $25 million in May, we announced”
Matt Manson· 08 Jul 2026·
capital needed
140,000 meter drilling program
“We raised 25 million in October, upsized the program to 140,000 meters”
Matt Manson· 05 Mar 2026·
cash position
25 million raised in October
“We raised 25 million in October, upsized the program to 140,000 meters”
Matt Manson· 05 Mar 2026·
Show the other 3 statements
capital needed
low initial capital
“very low capital very low cost of entry for this type of mine development”
Matt Manson· 21 Oct 2025·
cash position
$35 million in the bank
“$35 million in the bank. That funds us all the way through this year, all the way through next year”
Matt Manson· 21 Oct 2025·
capital needed
175 Canadian million
“So we estimate that in this recent mining study to be 175 Canadian million that's all.”
Matt Manson· 09 Oct 2025·

Timeline 8 statements

Timeline 8

Key takeaway. Radisson Mining Resources management has outlined a multi-year drill program and resource update timeline.

Read the full summary

The company reports that its exploration strategy changed 15 months ago (as of March 2026), and it is now carrying out a 140,000-meter drill program that started in October 2025. In March 2026 management said 72,500 meters would be drilled in 2025 and that the program runs through to the middle of 2027. A July 2026 statement says 72,000 meters will be drilled this year and the first half of next year, with an interim resource update in March showing 2.3 million ounces. According to the March 2026 comments, a resource update was expected towards the end of 2025, and another resource update is planned at the end of the program in mid-2027.

What was actually said
milestone
140,000 meter drill program started in October, 72,000 m this year and first half of next year
“the 140,000 m is we started that program back in October and that was adding 25 m budgeted 26 m which is about 72,000 m this year and then going into the first half of next year as well”
Matt Manson· 08 Jul 2026·
milestone
interim resource update in March showing 2.3 million ounces
“We did an interim resource update in March just just around about the time of the PDA when we talked last and that got us up to about 2.3 million ounces”
Matt Manson· 08 Jul 2026·
milestone
exploration strategy changed 15 months ago
“Starting about 15 months ago we changed the exploration strategy at O'Brien”
Matt Manson· 05 Mar 2026·
Show the other 5 statements
milestone
72.5 thousand meters drilling in 2025
“Um you know, 72 and a half thousand meters this year.”
Matt Manson· 05 Mar 2026·
milestone
drilling program runs through to middle of 2027
“through to the middle of 27.”
Matt Manson· 05 Mar 2026·
milestone
resource update towards end of 2025
“likely one more you know towards the end of the year”
Matt Manson· 05 Mar 2026·
milestone
another resource update at end of program mid-2027
“likely another one at the end of kind of the program mid20 27”
Matt Manson· 05 Mar 2026·
milestone
140,000 m drill program
“140,000 m drill program fully funded up to eight rigs”
Matt Manson· 21 Oct 2025·

Corporate 8 statements

Management 4

Key takeaway. Management at Radisson Mining Resources highlights a deep bench of operational experience.

Read the full summary

President and CEO Matt Manson notes he has been involved in three mine builds, while board members collectively hold experience from nine mine builds, a figure the CEO reiterated in later remarks. The company also reports that management and insiders own approximately 7% of the company.

What was actually said
track record
Matt Manson, president and CEO
“I'm Matt Manson. I'm the president and CEO of Rison Mining Resources”
Matt Manson· 08 Jul 2026·
track record
CEO involved in 3 mine builds; board members have 9 total mine builds experience
“I've been involved in three mine builds in my career... there's nine mindbuilds on on the Rison board.”
Matt Manson· 05 Mar 2026·
insider ownership
7% management and insiders
“Healthy share structure here. 7% management and insiders.”
Matt Manson· 21 Oct 2025·
Show the other 1 statement
track record
nine mine builds on that board between Pure Bodan, Peter McFale, myself
“There's nine mine builds on that board between Pure Bodan, Peter McFale, myself”
Matt Manson· 21 Oct 2025·

Share structure 1

What was actually said
insider stake
7% management and insiders
“Healthy share structure here. 7% management and insiders.”
Matt Manson· 21 Oct 2025·

Market 3

Key takeaway. Management says the company's discovery cost in its region is about $30 to $40 an ounce, placing it attractively on the cost curve (October 2025).

Read the full summary

They also point to adjacent operating gold mines and mills in the area, as well as mill owners and hub-and-spoke complexes, as potential acquirers of the project.

What was actually said
potential acquirer
adjacent operating gold mines and mills in region
“the vision is that ultimately following the heritage of mining in Quebec Abatibi. We see this project becoming integrated into one of these systems of mines and mills.”
Matt Manson· 21 Oct 2025·
cost curve position
discovery cost in that part of the world is maybe $30 $40 an ounce
“we're trading about $150 Canadian per ounce right now little bit more as of today the stock's doing well um our discovery cost in that part of the world is maybe $30 $40 an ounce”
Matt Manson· 09 Oct 2025·
potential acquirer
mill owners, hub and spoke complexes
“the obvious thing here is that this ready to go, big enough to be a new mine resource goes to one of these mills.”
Matt Manson· 09 Oct 2025·

Outside views 1 mention

1 mention by people who do not speak for the company — 1 constructive, 0 cautious, 0 neutral. These are their views, not the company's.

David Christie
bullish
O'Brien project operator; 140,000m drill program; just announced significant resource increase, which benefits Globex's royalty.
Crux Investor· 09 Mar 2026·

Sources 4 interviews

Every interview 4

DateChannelInterviewStatements
08 Jul 2026 Crux Investor Radisson Mining (TSXV:RDS) - O’Brien 82% Gold Resource Growth, Drilling Continues High Success Rate 11
05 Mar 2026 Crux Investor Radisson Mining (TSXV:RDS) - Delivers 82% Gold Resource Jump From Just 25% Of 140,000m Drill Program 19
21 Oct 2025 Crux Investor Radisson Mining (TSXV:RDS) - Pitch Perfect, October 2025 16
09 Oct 2025 Crux Investor Radisson Mining Resources (TSXV:RDS) O'Brien Gold Project Drives Toward 3-4 Moz Resource Target 14

What else those interviews covered

Every other asset named in the same recordings, by how many of them named it — the company's coverage context, not its holdings. Where the name is another company we hold a record for, it links to it.

gold 3
canada day 1
discovery silver 1
eldorado gold 1
equinox gold (valentine mine) 1
g2 1
iamgold corp 1

Questions people ask

What is Radisson Mining Resources's project and where is it?

Radisson Mining Resources is a explorer gold company, with a project stated to be in Quebec, Canada. Everything here is drawn from its executives' own interviews.

Which interviews mention Radisson Mining Resources?

We track 4 interviews mentioning Radisson Mining Resources, across 1 channel (Crux Investor).

What are investors saying about Radisson Mining Resources?

1 independent voice — people who do not speak for the company — are on record discussing it (1 bullish). Their reasoning is quoted in the outside-view section above.

What do recent interviews with Radisson Mining Resources cover?

The most-discussed topics on record are the deposit, timeline, economics, jurisdiction — each claim quoted and dated in the sections above.

How to read this page

What is here

Statements made by company representatives in the interviews listed above — each one carrying the words that made it, the date, and the recording. Nothing is added from any other source: if it was not said on a recording, it is not on this page. The one exception lives in the Claims & Checks record, which cites a metal price from our own feed so a stated cost can be set against it — and labels it as ours wherever it appears.

What is not verified

All of it. Resource figures, economics, timelines and promotional framing are management's own representations, checked against no filing and no technical report. Transcripts are automatic; we repair a clearly mis-heard word but never a number, a date, a unit or a speaker's hedge — “about 8.6 million ounces” keeps its “about”.

How to use it

Treat it as a map of what has been said, not as a source of fact. Where a figure matters to you, open the recording and read the company's filings. Nothing here is financial advice, a recommendation, or an offer to buy or sell any security — these are interested parties discussing their own company.

Workspace Intelligence
YOUR AGENT
Investigation
Open the latest investigation, or start a new one from the left.

Notice

Loading…