Project 19 statements
The deposit 8
Key takeaway. Management describes the deposit as a stockwork bulk tonnage deposit that can be mined by open pit and underground methods (Dec 2025, Sep 2025).
Read the full summary
According to the company, the bulk tonnage surface deposit contains about 100 million silver equivalent ounces, while the underground deposit holds roughly 113 million ounces (Dec 2025). The company also reports significant exploration upside, noting that only 3 or 4 kilometers of a 25-kilometer trend has been tested, and that stepping out along the property could yield an additional 73 to 100 million silver equivalent ounces in the first 2 to 3 kilometers (Dec 2025).
Show the other 5 statements
Jurisdiction 10
Key takeaway. Silver Tiger management says its projects are located in Sonora, Mexico.
Read the full summary
The company reports receiving a new bulk tonnage open pit permit in November 2025—described as the first new permit in Mexico since 2019—for its surface mine heat bleach project. Management notes that underground permits were already in place and that the new permit amends the existing 800-ton-per-day underground authorization for the open pit portion.
Show the other 7 statements
Technical risk 1
Economics 13 statements
Economics 7
Key takeaway. Management has outlined project economics for a bulk tonnage surface operation with an estimated capex of $86 million.
Read the full summary
The company reports a 92% IRR and an NPV of $750 million based on processing 60% of ore over a 9-year mine life, with all capital paid back in one year. On an after-tax annual basis, management says the operation would generate over $100 million in net cash flow once in production. Price assumptions cited include $30–$35 per ounce silver in May 2026, and as of December 2025, a gold-equivalent price of around $1,800 based on then-current market prices.
Show the other 4 statements
Financing 6
Key takeaway. Management has given several different figures for capital needs and cash on hand between late 2025 and mid-2026.
Read the full summary
In December 2025, the company reported over 50 million USD (later specified as 60 million US) in the bank, having raised 200 million Canadian since 2020 through bought-deal financings. At that time, management mentioned about 100 million US needed for the bulk tonnage portion of the deposit and a total capex of 186 million. By May 2026, the company said capital needed was $60 million.
Show the other 3 statements
Timeline 9 statements
Timeline 9
Key takeaway. Management has laid out several shifting timelines for the project.
Read the full summary
As of December 2025, the company said construction on the bulk tonnage deposit had started and would be in full operation by June/July 2026, with first production from that surface deposit expected in 18 to 24 months. A preliminary economic assessment for the underground steep deposit and a preliminary design assessment for an 800-ton-per-day underground operation were both due in January 2026 (as stated in December 2025). By May 2026, however, management referenced a "line in the sand" milestone for January 2027 and pushed first production to October 2027. Earlier, in September 2025, the company had said the open pit portion would be in production within 18 months and that permits were coming "very soon."
Show the other 6 statements
Corporate 5 statements
Management 5
Key takeaway. Management of Silver Tiger says its team has deep, decades-long experience in Mexico.
Read the full summary
The company notes that Francisco Ables joined two years ago, having built two big bulk tonnage deposits in Sonora and run them for 10 years until 2022, and that another key Mexico team member was the driving force at Argonaut from 2010 to 2023, building two bulk tonnage mines in Sonora and managing a 400-person operation. Management also reports that the CEO is the second biggest shareholder, and, as of September 2025, that the team has built one, two, three mines in Mexico and sold three more to majors.
Show the other 2 statements
Outside views 11 mentions
11 mentions by people who do not speak for the company — 9 constructive, 0 cautious, 1 neutral. These are their views, not the company's.
Show the other 7 mentions
Sources 6 interviews
Every interview 6
| Date | Channel | Interview | Statements |
|---|---|---|---|
| 11 May 2026 | The Deep Dive | We’re In for a Long Silver Bull Run! | Glenn Jessome - Silver Tiger | 7 |
| 27 Mar 2026 | Wall Street Bullion | WARNING: Silver Market COLLAPSE Incoming? What You Need to Know Now! | No claims identified |
| 07 Mar 2026 | David Lin | Silver Mines Vanishing Warns CEO: $300 Price This Cycle | Glenn Jessome | No claims identified |
| 19 Dec 2025 | The Deep Dive | People Don’t Want Cash. They Want Physical Silver. Glenn Jessome - Silver Tiger | 13 |
| 02 Dec 2025 | Crux Investor | Silver Tiger (TSXV:SLVR) | +$100M Annual Cash Flow From Bulk Tonnage Silver in Sonora | 19 |
| 22 Sep 2025 | The Deep Dive | Silver still at 90:1, What If It Snaps Back to 15:1? | Glenn Jessome - Silver Tiger | 7 |
What else those interviews covered
Every other asset named in the same recordings, by how many of them named it — the company's coverage context, not its holdings. Where the name is another company we hold a record for, it links to it.
Questions people ask
What is Silver Tiger's project and where is it?
Silver Tiger is a developer silver company, with a project stated to be in Sonora, Mexico. Everything here is drawn from its executives' own interviews.
Which interviews mention Silver Tiger?
We track 6 interviews mentioning Silver Tiger, across 4 channels (Crux Investor, David Lin, The Deep Dive, Wall Street Bullion).
What are investors saying about Silver Tiger?
11 independent voices — people who do not speak for the company — are on record discussing it (9 bullish, 1 neutral). Their reasoning is quoted in the outside-view section above.
What do recent interviews with Silver Tiger cover?
The most-discussed topics on record are jurisdiction, timeline, the deposit, economics — each claim quoted and dated in the sections above.