← Back to TranscriptAgent TranscriptAgent
← All mining companies

Tudor GoldTSXV:TUD

Gold developer, with a project stated to be in Golden Triangle, Northwest British Columbia.

British Columbia · Canada — as stated on the recordings

developer gold British Columbia, Canada
Sep 2025 → Apr 2026Covered
9 of 10Topics on record
6Figures tracked over time
1 executiveNamed on the record
Generate Claims & Checks What management and commentators said, and what still needs independent verification 8 interviews with the company · 6 independent recordings
Stage
Developer
Primary commodity
Gold
Jurisdiction
Golden Triangle, Northwest British Columbia
Deposit
world-class gold copper silver deposit
Latest appearance
27 Apr 2026
On record
9 interviews · 86 statements · 2 executives

At a glance

What the record holds today. Every card names where it came from — a management representation is not an established fact, and the page never blurs the two.

What is in the ground
3.4 million ounces indicated gold and 2.4 million inferred gold at $175 per ton cut-off
Management-stated Joe Ovsenek Apr 2026
Grade
approximately 2.5 gram of gold per ton at $125 cutoff; 2.8-2.5 gram range at $175 cutoff
Management-stated Joe Ovsenek Feb 2026
Capital needed
8 to 10,000 ton per day underground mine capex a billion billion and a half; bulk tonnage scenario probably about a 10 billion capex, maybe a bit less
Management-stated Joe Ovsenek Feb 2026
What happens next
Seabridge access road completion end of summer; 10-15,000m exploration drilling this summer; underground exploration ramp filed for
Management-stated Joe Ovsenek Apr 2026
The main open question
Management admits Seabridge's planned access tunnels impact 5 million oz of the upper deposit, requiring either tunnel rerouting or court resolution before permitted mining — an unresolved showstopper.
Weighed from the statements below, not our opinion of the company.
Our reading
How outsiders read it
4 independent voices on record — 3 constructive, 1 neutral, 2 cautious
Rudi Fronk, Thomas Parilla, Steve Barton, Unknown speaker
Outside voices

How the stated figures have moved

The same figure, as management put it on the earliest and the latest recording we hold. A difference may be a genuine update, a different measure of the same thing (total against indicated), or a mis-heard number — both quotes are here, and both recordings are one click away.

Ownership ● Broadly unchanged 4 statements on record
29 Dec 2025
80% interest in the project
“we have an 80% interest in the project.”
27 Apr 2026
80% interest in Treaty Creek
“We have an 80 We have an 80% interest in Treaty Creek.”
Shares outstanding ● Higher Same basis, restated 62 days apart 2 statements on record
23 Feb 2026
roughly 400 and change million shares outstanding
“capital structure roughly 400 and change million shares outstanding”
27 Apr 2026
409 million shares outstanding
“So quick look at our share structure 409 million shares outstanding”
Resource size 21.66 million oz8.4 million oz ≠ Different measure Stated in ounces, then in money — not the same quantity 11 statements on record
21 Oct 2025
21.66 million ounces of gold in the indicated category
“our main deposit, gold storm, uh which is this big discovery, 21 66 million ounces of gold in the indicated category.”
27 Apr 2026
8.4 million ounces of gold (8 million indicated, 2.6 million inferred) at $125 US per ton cut-off
“we're still looking at 5. >> [clears throat] >> 8 million ounces of gold. There's a There's a lot of gold here in in the uh >> [clears throat] >> Excuse me, indicated category. Another 2.6 million oun…”
Grade ≠ Different basis One statement qualifies the figure and the other does not (indicated, inferred) 5 statements on record
21 Oct 2025
0.92 g per ton
“21.66 million ounces at 0.92 g per ton in the gold in the golden triangle”
23 Feb 2026
85 g per ton indicated; 1.43 gram per ton inferred
“we have your 24.9 million ounces of uh gold at85 g per ton and another 4 million ounces of inferred gold at 1.43 43 gram per ton”
Operating cost ≠ Different basis One statement qualifies the figure and the other does not (gold, target) 2 statements on record
21 Oct 2025
250-300,000 ounce gold producer within minimum 10 year mine life
“250 300,000 ounce gold producer within the golden triangle minimum sort of 10 m life”
27 Jan 2026
Target production start of 300,000 ounces per year
“what we'd like to start at is in that 300,000 ounce range. That's a nice small”
Study due ? Wording changed No comparable date in one of the two statements 5 statements on record
21 Oct 2025
November, possibly dragging into December
“target is to get it out in November. We'll see if we're successful. We'll push hard for November. May drag a bit in December”
27 Apr 2026
Preliminary economic assessment target completion this summer
“our PEA where target is to get that completed this summer.”

Management view vs outside view

Management interviews are promotional by nature; the outside view is the counterweight. Both are quoted from the recordings, not added by us.

What management spends its time on

Counted from Tudor Gold's own claims across 9 interviews — most-covered theme first.

What outside voices pick up on

4 independent voices — people who do not speak for the company — across 9 mentions.

3 constructive 1 neutral 2 cautious
  • Rudi Fronk “Mentioned in the tunnel dispute; he frames a possible resolution rather than a market view.”
  • Thomas Parilla “Named as another miner he views as a buy during drill season.”
  • Steve Barton “The counterparty in the Mitchell Treaty Tunnel dispute; a source of legal risk but also a possible solution if it presents a mine …”
  • Unknown speaker “Management presents the company as a large-resource gold-copper developer with an underground path, financed drill program, and po…”

Bull · Bear · Watch next

Weighed from the statements on this page — management's pitch and the outside view. Not financial advice, and not our opinion of the company.

▲ Bull case

Management says Tudor holds one of the largest recent gold discoveries — 24.9 million indicated ounces at 0.85 g/t plus 4 million inferred — in Tier One Canada with an experienced team (five who built Brucejack in under 8 years).

What it rests on
Evidence: 2 moments from 2 interviews
Read the full case

Management says Tudor holds one of the largest recent gold discoveries — 24.9 million indicated ounces at 0.85 g/t plus 4 million inferred — in Tier One Canada with an experienced team (five who built Brucejack in under 8 years). The deposit has higher-grade zones within it (2.5–2.8 g/t at production cutoffs) to support a 250–300,000 oz/year underground operation, with exploration upside from unmined zones on the 70 km property. An outside investor notes the project should reprice as majors seek reserves.

▼ Bear case

Management admits Seabridge's planned access tunnels impact 5 million oz of the upper deposit, requiring either tunnel rerouting or court resolution before permitted mining — an unresolved showstopper.

What it rests on
Evidence: 2 moments from 2 interviews
Read the full case

Management admits Seabridge's planned access tunnels impact 5 million oz of the upper deposit, requiring either tunnel rerouting or court resolution before permitted mining — an unresolved showstopper. Rudi Fronk dismisses Tudor as having no viable project or PEA after 10 years; three petitions already filed against Seabridge's tunnel routes. Capex ($1–1.5 billion for initial mine, up to $10 billion for bulk tonnage) is substantial, and share dilution is material: 409 million shares outstanding with Eric Sprott at 14%.

◆ Watch next

Seabridge tunnel permit decision and renegotiation outcome (no timeline given).

What it rests on
Evidence: 2 moments from 2 interviews
Read the full case

Seabridge tunnel permit decision and renegotiation outcome (no timeline given). Summer 2025: Seabridge access road completion, 10–15,000m exploration drilling, maiden resource from other deposits. Q1 2026: Metallurgy wrap-up (targeting end of March); mine plan due end of March. PEA targeted for summer 2025. Resolution of tunnel conflict determines whether project advances or stalls.

Each moment links to the exact point in the source recording. The cases are drawn from the transcripts, weighed as written — they are not a rating, a target or a recommendation.

Project 50 statements

The deposit 26

Key takeaway. Management describes the deposit as a "world-class gold copper silver deposit" (Apr 2026) and a bulk-tonnage gold resource with higher-grade mineralization in the two-to-three-gram range (Feb 2026) that could support high-grade underground…

Read the full summary

mining (Oct 2025). The company has reported a wide range of resource figures across its releases: in April 2026 it stated 24.9 million ounces of indicated gold and 4 million ounces of inferred gold, but also gave figures of 8.4 million ounces at a $125 per ton cut-off and 3.4 million indicated and 2.4 million inferred ounces at a $175 cut-off. Earlier in February and January 2026, similar numbers appear, while a December 2025 release cited 21.6 million indicated and 4.88 million inferred ounces—the figures vary depending on the cut-off grade and date cited.

What was actually said
deposit type
world-class gold copper silver deposit
“it is a world-class gold copper silver deposit.”
Joe Ovsenek· 27 Apr 2026·
exploration upside
Goldstorm deposit is on Sulphurets Fault; other prospects with discovered gold along fault on claims; maiden resource target from 10-15,000m drilling this summer for another deposit
“We have other prospects where we've discovered gold. Uh we haven't had the ability to follow up on it, but we've discovered gold uh in other spots along the fault on our claims.”
Joe Ovsenek· 27 Apr 2026·
resource size
3.4 million ounces indicated gold and 2.4 million inferred gold at $175 per ton cut-off
“we still have some really nice shapes, and we're still sitting at 3.4 million ounces of indicated gold, and another 2.4 of inferred.”
Joe Ovsenek· 27 Apr 2026·
Show the other 23 statements
resource size
24.9 million oz of gold in the indicated category, 4 million oz of gold in the inferred category
“We have 25 24.9 million oz of gold in the indicated category, another 4 million oz of gold in the inferred category.”
Joe Ovsenek· 27 Apr 2026·
resource size
8.4 million ounces of gold (8 million indicated, 2.6 million inferred) at $125 US per ton cut-off
“we're still looking at 5. >> [clears throat] >> 8 million ounces of gold. There's a There's a lot of gold here in in the uh >> [clears throat] >> Excuse me, indicated category. Another 2.6 million ounces in the inferred.”
Joe Ovsenek· 27 Apr 2026·
deposit type
bulk tonnage gold resource with higher grade mineralization in 2 to 3 to 4 g range; gold-copper deposit
“we have this large bulk tonnage gold resource, but within that resource, we actually have some higher grade mineralization in that 2 to 3 to 4 g range.”
Joe Ovsenek· 23 Feb 2026·
exploration upside
potential for even higher undergrade mine in 8 to 10 grams with SC1 zone; need to get underground and do more drilling, down 6 to 900 meters below surface
“there's the potential for an even higher undergrade mine in that 8 to 10 grams with the SC1 zone. We have some of that SC1 zone in our resource estimate. Uh however, we need to get underground and do more drilling. It's it's down 6 to 900 mters below surf”
Joe Ovsenek· 23 Feb 2026·
grade
approximately 2.5 gram of gold per ton at $125 cutoff; 2.8-2.5 gram range at $175 cutoff
“we're looking at 8.4 million ounces. that's combined indicating an unferred and you know pretty dang good grade and you know in the probably about 2.5 gram of gold per ton somewhere in that range... Average grade it's going to be I don't know 2.8 2.5 somewhere in that range.”
Joe Ovsenek· 23 Feb 2026·
grade
85 g per ton indicated; 1.43 gram per ton inferred
“we have your 24.9 million ounces of uh gold at85 g per ton and another 4 million ounces of inferred gold at 1.43 43 gram per ton”
Joe Ovsenek· 23 Feb 2026·
resource size
24.9 million ounces of indicated gold and 4 million ounces of inferred gold
“we have one of the largest gold discoveries in recent times at our Treaty Creek project. indicated gold or almost 25 million ounces of gold on the inferred category, four million ounces of gold.”
Joe Ovsenek· 23 Feb 2026·
resource size
8.4 million ounces at $125 per ton cutoff; 5.8 million ounces at $175 per ton cutoff
“if we look at the $125 cut off, we're looking at 8.4 million ounces. that's combined indicating an unferred... So if we look at the $125 cut off we look at the US 175 per ton or you know 3.4 in the indicated 2.4 in the inferred so 5.8 million ounces of gold above that 175 cutoff.”
Joe Ovsenek· 23 Feb 2026·
deposit type
Gold Storm deposit at Treaty Creek
“we've just announced an updated mineral resource estimate for our gold storm deposit at Treaty Creek”
Joe Ovsenek· 27 Jan 2026·
exploration upside
Other deposits on property including Perfect Storm, CBS zone, and Eureka zone with target of 5 million ounces from summer drilling program
“we know there are other deposits on this property. We're confident in that from our geological analysis and that. Uh so we are coming back this summer. We're going to drill. I I think you could see us drilling 10 15,000 meters”
Joe Ovsenek· 27 Jan 2026·
grade
2.33 g per ton gold (indicated at $175 NSR), 4.02 g per ton gold (inferred at $175 NSR)
“the grade of the indicated is 2.33 g per ton gold while the grade of the infurred is 4 g 4.02 so over four grams per ton gold.”
Joe Ovsenek· 27 Jan 2026·
resource size
5.8 million ounces indicated and 2.6 million inferred at $125 NSR
“at the $125 a ton smelter revenue, uh, we're at 5.8 million ounces of gold in the indicated and another 2.6 in the inferred.”
Joe Ovsenek· 27 Jan 2026·
resource size
3.4 million ounces indicated and 2.4 million inferred at $175 NSR
“we take that up to 175 bucks and we still have significant gold resources. Uh, 3.4 million in the indicated category. That's ounces of gold plus silver and copper uh plus another 2.4 million ounces uh of of gold in the inferred category.”
Joe Ovsenek· 27 Jan 2026·
resource size
24.9 million ounces indicated, 4 million ounces inferred
“there's the big bulk tonnage number, 24.9 million ounces indicated, another 4 million ounces in the inferred.”
Joe Ovsenek· 27 Jan 2026·
exploration upside
north of 5 million ounces at north of 2 g of gold per tons
“our target is we'd like to see north of 5 million ounces at north of 2 g of gold per tons.”
Joe Ovsenek· 13 Jan 2026·
resource size
21.66 million ounces of gold
“we're quite comfortable in you know 80% of the deposits in the indicated category you know for a big deposit like that you know where indicated 21.66 66 million ounces of gold.”
Joe Ovsenek· 13 Jan 2026·
exploration upside
Perfect Storm deposit potentially bigger and higher grade than Gold Storm
“ultimately the geos feel that perfect storm will be bigger and higher grade than gold storm and we plan on kicking off that drilling this summer.”
Joe Ovsenek· 29 Dec 2025·
exploration upside
1.23 g per ton gold over 102 m hole at Perfect Storm in 2023
“at perfect storm we we drilled some holes in 2023. Um I think the last hole we drilled we intersected 1.23 g per ton gold over 102 m.”
Joe Ovsenek· 29 Dec 2025·
grade
two to three gram range
“we have higher grade gold mineralization in the two to three grand range which we feel will allow us to kickstart mining at our project.”
Joe Ovsenek· 29 Dec 2025·
resource size
21.6 million ounces of indicated gold, 4.88 million ounces of inferred gold
“we have one of the largest gold discoveries in recent times in North America, 21.6 million ounces of indicated gold, 4.88 million ounces of inferred gold.”
Joe Ovsenek· 29 Dec 2025·
deposit type
high-grade underground mining with 2 to 3 gram mineralization lenses
“within that there's higher grade mineralization like 2 to three gram mineralization”
Joe Ovsenek· 21 Oct 2025·
grade
0.92 g per ton
“21.66 million ounces at 0.92 g per ton in the gold in the golden triangle”
Joe Ovsenek· 21 Oct 2025·
resource size
21.66 million ounces of gold in the indicated category
“our main deposit, gold storm, uh which is this big discovery, 21 66 million ounces of gold in the indicated category.”
Joe Ovsenek· 21 Oct 2025·

Jurisdiction 13

Key takeaway. Tudor Gold's project is located in the Golden Triangle of northwest British Columbia, Canada, approximately 70 kilometers north of Stewart (Feb 2026).

Read the full summary

Management says the province is "very focused on mining" and "truly making it a tier one mining jurisdiction" (Feb 2026). On permitting, the company notes it filed a development permit for an underground ramp in August (Dec 2025), while proceedings are ongoing with the province and Seabridge regarding a tunnel route through the property (Oct 2025). A permitting decision for the tunnel requires an agreement with Seabridge, and management says it is "negotiating path forward" with that company (Apr 2026). Regarding community relations, the company describes First Nations as supportive, "very commercial," and wanting economic contribution with proper work standards (Feb 2026).

What was actually said
community agreement
Negotiating path forward with Seabridge; permitting decision requires agreement with Seabridge before tunnel permit granted
“the government of British Columbia came out uh with with the mines branch of the government of British Columbia came out with a decision that they were not going to make a decision on granting that permit for the development of those tunnels until A they a Seabridge reached an agreement with Tudor”
Joe Ovsenek· 27 Apr 2026·
country
Canada
“we're located in the Golden Triangle up in Northwest British Columbia.”
Joe Ovsenek· 27 Apr 2026·
region
Golden Triangle, Northwest British Columbia
“we're located in the Golden Triangle up in Northwest British Columbia.”
Joe Ovsenek· 27 Apr 2026·
Show the other 10 statements
community agreement
supportive First Nations; described as very commercial, wanting economic contribution to their nation with proper work standards
“we have good support from the local First Nations up in the area where we're in the First Nations very commercial. They want to know, yeah, you're going to do things right, but you know, if if it contributes to their economy and and the wealth of their nation, they're all in.”
Joe Ovsenek· 23 Feb 2026·
country
Canada
“our Treaty Creek project is located in the Golden Triangle. That's up in northwest British Columbia.”
Joe Ovsenek· 23 Feb 2026·
political risk
BC very focused on mining and believing that's a path for the future; truly making it a tier one mining jurisdiction
“BC very focused on on mining and believing that's a path for the future for the province. Uh, truly making it a tier one mining jurisdiction and we have good support from the local First Nations”
Joe Ovsenek· 23 Feb 2026·
region
Golden Triangle, northwest British Columbia, roughly 70 kilometers north of the town of Stewart
“our Treaty Creek project is located in the Golden Triangle. That's up in northwest British Columbia. We're just to the east of the Alaska panhandle. Uh we're roughly 70 kilometers north of the town of Stewart”
Joe Ovsenek· 23 Feb 2026·
region
Golden Triangle
“You need that scale because you have a lot of costs involved with mining up in the Golden Triangle.”
Joe Ovsenek· 13 Jan 2026·
country
Canada
“we have one of the largest gold discoveries in recent times in North America, 21.6 million ounces of indicated gold, 4.88 million ounces of inferred gold.”
Joe Ovsenek· 29 Dec 2025·
permit status
development permit filed in August for underground ramp
“in last August, we filed for a development permit so we can develop an underground ramp and, you know, excavate a ramp down into the heart of the deposit and drill it off at tighter drill spacing.”
Joe Ovsenek· 29 Dec 2025·
region
Golden Triangle in northwest British Columbia
“It's located in the Golden Triangle in northwest British Columbia, just to the east of the Alaska panhandle.”
Joe Ovsenek· 29 Dec 2025·
permit status
Proceedings ongoing with province and Seabbridge regarding tunnel route through property
“we have a few proceedings going on in the courts in BC uh on a few issues here against the province as well as with Seabbridge”
Joe Ovsenek· 21 Oct 2025·
region
Golden Triangle, British Columbia
“20 to three gram mineralization. So what we are looking at is um the the resource estimate when we came in that was based on bulk tonnage mining or you go in blog cave and that now as a team like ours it's a small team we have experience but you know we're not building 150 ton a day mine that that's for you know big companies uh but what we can build is something in that 8 to 10,000 ton a day longhole stoope uh underground mine and and that's where we see our niche”
Joe Ovsenek· 21 Oct 2025·

Technical risk 11

Key takeaway. Tudor Gold's management has outlined several technical risks and assumptions for their project.

Read the full summary

They note that Seabridge tunnels affect about 5 million ounces of gold in the upper part of the deposit, with resolution depending on Seabridge agreeing to flex the tunnels or a court decision expected in April 2026. Surface drilling is limited to 4 or 5 months per year due to heavy snow conditions, with 22 meters of snow recorded (February 2026). Management also states they need to put a mine plan on the resource and merge it with metallurgy before moving to a PEA (January 2026), and they must go underground to establish continuity of grade along structures. Their key assumptions include an underground longhole stope operation targeting 8,000–10,000 tons per day (January 2026) for production of 250,000–300,000 ounces of gold per year on 3 g/t or better material (February 2026).

What was actually said
stated risk
Seabridge tunnels impact about 5 million oz of gold in upper part of deposit; resolution depends on Seabridge agreeing to flex tunnels around deposit or court decision
“the shortest route possible goes right through the upper part of our deposit, impacts about 5 million oz of gold, which has a lot of value, especially at $5,000 an ounce.”
Joe Ovsenek· 27 Apr 2026·
key assumption
targeting 250-300,000 ounces of gold per year production from underground mine on 3 grams per ton or better material
“Can we outline enough gold and that say three three grams per ton gold to come up with a nice starter mine producing 250 300,000 ounces of gold a year.”
Joe Ovsenek· 23 Feb 2026·
stated risk
Weather limitation on surface drilling (limited to 4 or 5 months per year); heavy snow conditions (22 meters recorded)
“Right now we're limited to four or five months a year on surface drilling. So get underground, drill all year round, get the infill drilling done... you don't want to be shoveling snow constantly... last time we worked up there is 22 meters”
Joe Ovsenek· 23 Feb 2026·
Show the other 8 statements
key assumption
Underground operation: long hole stope, 8-10,000 tons per day initial production
“it's going to be a long hole stoope 8 to 10,000 tons a day to give you some rough parameters of what we're looking at to start with.”
Joe Ovsenek· 27 Jan 2026·
key assumption
Net smelter revenue calculations at $50, $125, and $175 per ton
“we did that at $125 and $175. And so you know the base case was at $50.”
Joe Ovsenek· 27 Jan 2026·
stated risk
Need to put mine plan on resource and merge with metallurgy before moving to PEA
“It's a question of putting the mine plan on it, merging that in with our metal energy and you know coming coming up with flowheet.”
Joe Ovsenek· 27 Jan 2026·
key assumption
drilling cost from underground approximately 200-225 dollars per meter
“we went from say 450 500 bucks about 450 bucks a meter. We got underground, we were drilling for about 200, $225 a meter.”
Joe Ovsenek· 13 Jan 2026·
key assumption
drilling cost from surface approximately 500 dollars per meter
“from surface we're spending, you know, about 500 bucks a meter all in.”
Joe Ovsenek· 13 Jan 2026·
key assumption
10,000 ton per day underground concept
“under like 10,000 ton per day underground concept? I mean that's that's that's a lot of sunage.”
Joe Ovsenek· 13 Jan 2026·
stated risk
need to get underground and establish continuity of grade along structures
“if you're mining that higher grade, you you want to have continuity so you can go in, set up your stoopes, and and you know, when you mine them, you're getting the ore that you expected to have there.”
Joe Ovsenek· 13 Jan 2026·
key assumption
8 to 10,000 ton a day longhole stope underground mine model; target 50-100 million tons in 2-3g range
“we can build is something in that 8 to 10,000 ton a day longhole stoope uh underground mine. If we can outline 50 to 100 million tons in that 2 to three g range, that's a mine.”
Joe Ovsenek· 21 Oct 2025·

Economics 7 statements

Economics 6

Key takeaway. Tudor Gold's management has shared preliminary project economics for their gold project that vary depending on the scenario and timeframe cited.

Read the full summary

In April 2026, management indicated a PEA assumes underground long hole stoping at 10,000 tons per day with a higher cut-off initially, envisioning a 200,000 to 300,000-ounce gold producer for 20-plus years. However, earlier statements show less ambitious mine life expectations: in October 2025 management targeted a 250,000–300,000-ounce gold producer with a minimum 10-year mine life, and in January 2026 a target production start of 300,000 ounces per year was mentioned. On capital costs, management said in February 2026 that an 8,000–10,000 ton per day underground mine would carry a capex of "a billion to a billion and a half," while a bulk tonnage scenario would be "about a 10 billion capex, maybe a bit less." For valuation discussions management uses a gold price assumption of $5,000 an ounce, and different cutoff grades—$50, $125, and $175 per ton—have been referenced in February 2026 discussions.

What was actually said
key assumption
200 to 300,000 oz gold producer for 20 years plus using underground long hole stoping at 10,000 tons per day with paste backfill
“come up with a 2 to 300 oz 200 to 300,000 oz gold producer for you know, 20 years plus.”
Joe Ovsenek· 27 Apr 2026·
price assumption
$5,000 an ounce for gold valuation discussion; PEA assuming underground long hole stoping at 10,000 tons a day with higher cut-off initially
“which has a lot of value, especially at $5,000 an ounce.”
Joe Ovsenek· 27 Apr 2026·
capex
8 to 10,000 ton per day underground mine capex a billion billion and a half; bulk tonnage scenario probably about a 10 billion capex, maybe a bit less
“this higher grade underground line, say targeting that 3 g or better material to start with. um and and come up with say a 8 to 10,000 ton per day underground mine capex a billion billion and a half.”
Joe Ovsenek· 23 Feb 2026·
Show the other 3 statements
price assumption
$50 NSR cutoff; $125 per ton cutoff; $175 per ton cutoff
“we used a $50 NSR cutoff. And what we mean by that is we looked at all the different blocks that make up that resource estimate... we did $125 ton per ton cut off and $175 per ton cut off.”
Joe Ovsenek· 23 Feb 2026·
operating cost
Target production start of 300,000 ounces per year
“what we'd like to start at is in that 300,000 ounce range. That's a nice small”
Joe Ovsenek· 27 Jan 2026·
operating cost
250-300,000 ounce gold producer within minimum 10 year mine life
“250 300,000 ounce gold producer within the golden triangle minimum sort of 10 m life”
Joe Ovsenek· 21 Oct 2025·

Financing 1

What was actually said
capital needed
about 14 15 million Canadian for Perfect Storm drilling
“Have a budget about 14 15 million Canadian.”
Joe Ovsenek· 29 Dec 2025·

Timeline 16 statements

Timeline 16

Key takeaway. Management has provided a shifting timeline across several updates.

Read the full summary

In late 2025 the company targeted a preliminary economic assessment (PEA) by mid-2026, an updated resource estimate incorporating a higher-grade gold sensitivity, and a development permit expected around mid-year. By January 2026 the PEA was narrowed to Q3 (hopefully early Q3), and the company added a summer drilling program of 10,000–15,000 meters on other deposits, an underground permit targeted for this year, and a resource estimate by end of that month. In February and April 2026 the timeline continued to evolve: the metallurgy target and mine plan were set for end of March 2026 (with metallurgy possibly into April), the PEA target moved to "this summer," and a maiden resource estimate for another deposit was tied to the summer drilling. The claims from different months do not always align on specific dates.

What was actually said
milestone
Seabridge access road completion end of summer; 10-15,000m exploration drilling this summer; underground exploration ramp filed for
“from what I understand, that should be completed by the end of this summer.”
Joe Ovsenek· 27 Apr 2026·
milestone
Maiden resource estimate target for another deposit from summer drilling
“we want to come up with a maiden resource from this summer's work for another another deposit on our ground”
Joe Ovsenek· 27 Apr 2026·
study due
Preliminary economic assessment target completion this summer
“our PEA where target is to get that completed this summer.”
Joe Ovsenek· 27 Apr 2026·
Show the other 13 statements
milestone
metallurgy target end of March 2026 (may drag into April); mine plan target end of March; preliminary economic assessment target sometime this summer
“The idea is let's get that metallergy finished this quarter. So the target is to have the metal energy wrapped up by the end of March 2026. It may drag a bit into April... The target is to get that done by the end of March... and if it looks good, let's push ahead with a preliminary economic assessment with a plan of getting that completed by sometime this summer.”
Joe Ovsenek· 23 Feb 2026·
milestone
Underground development ramp permit to be filed in the coming month
“We filed that. The government said, "Look, you guys got to come back with more data. So we're putting that data together. We should get it filed in fe this, you know, in the coming month."”
Joe Ovsenek· 27 Jan 2026·
milestone
Summer drilling program of 10-15,000 meters on other deposits
“we are coming back this summer. We're going to drill. I I think you could see us drilling 10 15,000 meters”
Joe Ovsenek· 27 Jan 2026·
permit timing
Underground permit targeted for this year
“still pushing to get our permit this year. I I think we're on track to do that.”
Joe Ovsenek· 27 Jan 2026·
study due
PEA in Q3, hopefully early Q3
“you could see Q3, I would say hopefully early Q3, you could see a PA on uh placing uh the gold store deposit into production”
Joe Ovsenek· 27 Jan 2026·
milestone
resource estimate target by end of this month
“We're going to judge on we're going to get a resource estimate out. Target is by the end of this month.”
Joe Ovsenek· 13 Jan 2026·
milestone
permit for underground decline exploration program, filed August, expect to get permit this year
“We filed a permit uh for for an underground uh declines underground exploration program back in August. Uh we've heard back from the government. They want more information. We still expect to get the permit this year.”
Joe Ovsenek· 13 Jan 2026·
study due
PEA mid year, Q3, hopefully closer to beginning of Q3
“Uh this is on the uh gold storm deposit or existing deposit pea. I'd like to say mid year. Uh so sometime in Q3, I'd say hopefully closer to the beginning of Q3”
Joe Ovsenek· 13 Jan 2026·
milestone
preliminary economic assessment completed by mid 2026
“We'll move forward with a preliminary economic assessment and we'd like to get that assessment completed by mid 2026.”
Joe Ovsenek· 29 Dec 2025·
milestone
updated resource estimate with sensitivity on higher grade gold in 2 to 3 g range
“his focus is on not only on coming up with an updated bulk tonnage estimate, but also providing us with a sensitivity of the higher grade gold in that 2 to three g range.”
Joe Ovsenek· 29 Dec 2025·
permit timing
development permit expected mid year
“We expect to get this started in mid year as soon as we have the permit.”
Joe Ovsenek· 29 Dec 2025·
study due
January of this year
“we expect to get it out in January of this year.”
Joe Ovsenek· 29 Dec 2025·
study due
November, possibly dragging into December
“target is to get it out in November. We'll see if we're successful. We'll push hard for November. May drag a bit in December”
Joe Ovsenek· 21 Oct 2025·

Corporate 13 statements

Management 6

Key takeaway. Tudor Gold's management highlights its track record of building the Brucejack mine, which went from discovery in 2009 to first gold pour in June 2017—under eight years to discover, drill off, permit, engineer and build, according to the…

Read the full summary

company. The CEO notes that the team of five worked together at Silver Standard and then at PR Resources, and knows what it takes to move a project from discovery through to production quickly. Management also points out that it has operated in the Golden Triangle jurisdiction for years and understands the local infrastructure, First Nations, communities and government, with the Tudor property located just 15 km from Treaty Creek.

What was actually said
team experience
Operated in Golden Triangle jurisdiction; know infrastructure, First Nations, local communities and government from Brucejack; located 15 km from Treaty Creek
“our team. And and that mine is literally 15 km south of our Treaty Creek project. So we know the area. We we know the infrastructure. We know the First Nations and we know the local communities and the government.”
Joe Ovsenek· 27 Apr 2026·
track record
Built Brucejack mine; took project from discovery in 2009 through to first gold pour in June of 2017, under 8 years to discover, drill off, permit, engineer, and build
“We completed Uh we took our Brucejack mine from discovery in 2009 through to our first gold first gold pour in June of 2017.”
Joe Ovsenek· 27 Apr 2026·
track record
team of five who worked together at Silver Standard and then at PR Resources; know what it takes to move a project from discovery through to production in short order
“We've got uh five of us all work together at first at Silver Standard and then at uh PR resources... and uh we know what it takes to move a project from uh discovery through to production in in short order.”
Joe Ovsenek· 23 Feb 2026·
Show the other 3 statements
team experience
management team together since mid to early 90s
“This management team's been together some of us have been together since the mid to early 90s.”
Joe Ovsenek· 29 Dec 2025·
track record
discovered, built, and operated Bruce Jack mine
“Our team discovered, built, and operated that mine.”
Joe Ovsenek· 29 Dec 2025·
track record
Built Bruce Jack Mine 15 kilometers south of Tudor property; worked with Seabridge on KSM at Predium Resources
“the mine we built Bruce Jack Mine is about 15 kilometers south of Tutor uh our property. Um KSM we dealt with the guys at Seabbridge while we were at Predium.”
Joe Ovsenek· 21 Oct 2025·

Share structure 6

Key takeaway. Management has described Tudor Gold's share structure in several updates.

Read the full summary

In February 2026, the company said there were "roughly 400 and change million shares outstanding," and by April 2026 that figure had become 409 million shares outstanding. Regarding insider alignment, management noted in December 2025 that insiders hold an 80% interest in the project, and repeated the same 80% figure in April 2026. Additionally, the company reported in February 2026 that Eric Sprott holds 14% of the company, has participated in recent financings, and is described as a believer in the project.

What was actually said
insider stake
80% interest in Treaty Creek
“We have an 80 We have an 80% interest in Treaty Creek.”
Joe Ovsenek· 27 Apr 2026·
shares outstanding
409 million shares outstanding
“So quick look at our share structure 409 million shares outstanding”
Joe Ovsenek· 27 Apr 2026·
insider stake
Eric Sprott holds 14% of the company
“Eric Sprat you know everybody knows Eric Sprat the big investor in in these gold gold projects um a big gold bull holds 14% of the company”
Joe Ovsenek· 23 Feb 2026·
Show the other 3 statements
insider stake
Eric Sprott has participated in recent financings and is described as a believer in the project
“a big gold bull holds 14% of the company and and has participated in our last finance few financings so uh a believer in the project and a believer in gold”
Joe Ovsenek· 23 Feb 2026·
shares outstanding
roughly 400 and change million shares outstanding
“capital structure roughly 400 and change million shares outstanding”
Joe Ovsenek· 23 Feb 2026·
insider stake
80% interest in the project
“we have an 80% interest in the project.”
Joe Ovsenek· 29 Dec 2025·

Market 1

What was actually said
cost curve position
250 300,000 ounce gold producer, tier one asset
“we feel Treaty Creek has the potential to be a 300,000 ounce gold producer. 250 300,000 ounce gold producer. That's that's like for most major gold companies that's a tier one asset”
Joe Ovsenek· 13 Jan 2026·

Outside views 9 mentions

9 mentions by people who do not speak for the company — 3 constructive, 2 cautious, 1 neutral. These are their views, not the company's.

Rudi Fronk
neutral
Mentioned in the tunnel dispute; he frames a possible resolution rather than a market view.
Investing News· 14 Jul 2026·
Thomas Parilla
bullish
Named as another miner he views as a buy during drill season.
Wall Street Bullion· 28 Jun 2026·
Rudi Fronk
mixed
The counterparty in the Mitchell Treaty Tunnel dispute; a source of legal risk but also a possible solution if it presents a mine plan.
Rule Investment Media· 22 May 2026·
Steve Barton
mixed
The counterparty in the Mitchell Treaty Tunnel dispute; a source of legal risk but also a possible solution if it presents a mine plan.
Rule Investment Media· 22 May 2026·
Show the other 5 mentions
Rudi Fronk
bearish
Named as the counterparty opposing the tunnels and challenging rights at KSM.
The Deep Dive· 06 May 2026·
Unknown speaker
bullish
Management presents the company as a large-resource gold-copper developer with an underground path, financed drill program, and potential catalyst stack.
Resource Talks· 28 Apr 2026·
Unknown speaker
unclear
Mentioned only in context of CEO's dual role; PEA underway, completing summer 2026; no directional view expressed
Resource Talks· 14 Apr 2026·
Rudi Fronk
bearish
Fronk dismisses Tudor as not having shown a viable project or PEA in 10 years; three petitions filed against Seabridge's tunnel routes
The Deep Dive· 26 Nov 2025·
Thomas Parilla
bullish
Cited alongside Juggernaut as an exploration miner that has barely moved but should reprice as majors seek reserves
Wall Street Bullion· 26 Feb 2025·

Sources 9 interviews

Every interview 9

DateChannelInterviewStatements
27 Apr 2026 Crux Investor Tudor Gold (TSXV:TUD) - 'Undervalued?' Investment Series, with Joseph Ovsenek 18
23 Feb 2026 Crux Investor Tudor Gold Corp (TSXV:TUD) – All Known Questions Answered, February 2026 19
06 Feb 2026 David Lin Gold Explosion Still Has 'Upside', Says CEO Who Called $5,000 | Joe Ovsenek No claims identified
27 Jan 2026 Crux Investor Tudor Gold (TSXV:TUD) - Resource Update Reveals Tier-One Potential 14
13 Jan 2026 Crux Investor Tudor Gold (TSXV:TUD) - Developer Eyes 300K Oz/Year Production 11
29 Dec 2025 Crux Investor Tudor Gold (TSXV:TUD) - Pitch Perfect, December 2025 15
21 Oct 2025 Crux Investor Tudor Gold (TSXV:TUD) - New Leadership Refines 21.66Moz Resource for High-Grade Underground Mining 9
25 Sep 2025 David Lin Gold To $8,900, Silver To ‘Triple Digits’, Here's When | Ronald-Peter Stoeferle No claims identified
20 Sep 2025 David Lin $3,600 Gold Price Is 'Early Stages', What's Next For Markets? | Joe Ovsenek No claims identified

What else those interviews covered

Every other asset named in the same recordings, by how many of them named it — the company's coverage context, not its holdings. Where the name is another company we hold a record for, it links to it.

gold 8
tudor gold corp 4
silver 4
copper 3
teuton resources 2
treaty creek 2
brucejack mine 1

Questions people ask

What is Tudor Gold's project and where is it?

Tudor Gold is a developer gold company, with a project stated to be in British Columbia, Canada. Everything here is drawn from its executives' own interviews.

Which interviews mention Tudor Gold?

We track 9 interviews mentioning Tudor Gold, across 2 channels (Crux Investor, David Lin).

What are investors saying about Tudor Gold?

9 independent voices — people who do not speak for the company — are on record discussing it (3 bullish, 1 neutral, 2 cautious). Their reasoning is quoted in the outside-view section above.

What do recent interviews with Tudor Gold cover?

The most-discussed topics on record are the deposit, timeline, jurisdiction, technical risk — each claim quoted and dated in the sections above.

How to read this page

What is here

Statements made by company representatives in the interviews listed above — each one carrying the words that made it, the date, and the recording. Nothing is added from any other source: if it was not said on a recording, it is not on this page. The one exception lives in the Claims & Checks record, which cites a metal price from our own feed so a stated cost can be set against it — and labels it as ours wherever it appears.

What is not verified

All of it. Resource figures, economics, timelines and promotional framing are management's own representations, checked against no filing and no technical report. Transcripts are automatic; we repair a clearly mis-heard word but never a number, a date, a unit or a speaker's hedge — “about 8.6 million ounces” keeps its “about”.

How to use it

Treat it as a map of what has been said, not as a source of fact. Where a figure matters to you, open the recording and read the company's filings. Nothing here is financial advice, a recommendation, or an offer to buy or sell any security — these are interested parties discussing their own company.

Workspace Intelligence
YOUR AGENT
Investigation
Open the latest investigation, or start a new one from the left.

Notice

Loading…