Project 38 statements
The deposit 25
Key takeaway. Management describes a zinc-lead-silver system with growing copper potential, classifying the deposit as Mississippi Valley type with zinc, lead, silver, copper, germanium, and antimony.
Read the full summary
The company reports an overall resource estimate of 50 million tonnes of mineralization between Palisgreen and Stone Park, with Stone Park alone hosting 5 million tonnes at 11.3% zinc-lead. On grade, management says silver typically runs between 50 and 150 grams per tonne (with up to 4,000 g/t in some intercepts), zinc-lead typically runs 10% (with intercepts reaching the 50s and 60s percent), and highlights specific hits such as 52 meters of 10% zinc-lead with 330 g/t silver and 0.4% copper in hole 51, and 8.4 meters of nearly 2,000 g/t silver with 2.2% copper and 0.18% antimony. The company notes that approximately 25% of a 6-kilometre mineralized horizon is drill-defined, with the remaining 75% based on four gravity high anomalies, only one of which (the C anomaly) has been systematically drilled so far.
Show the other 22 statements
Jurisdiction 7
Key takeaway. Management describes Ireland as a safe jurisdiction offering political stability, safety, and infrastructure.
Read the full summary
The company notes the proximity to European smelters and existing infrastructure in Ireland, with operations focused on the Valley Wire and Limmerch areas of Ireland, within the Wrath Downey Trend.
Show the other 4 statements
Technical risk 6
Key takeaway. Management describes the metallurgy as "coarse grained and clean," capable of producing "beautiful concentrates," with the zinc-lead-silver system expected to yield separate zinc and lead concentrates and the copper-silver system composed…
Read the full summary
of all sulfides (April and June 2026). The company assumes that copper-silver mineralization will continue along the entire 3.2 km strike as one integrated system with shared plumbing, hosted within a lower limestone-shale unit beneath the zinc zone (April and October 2025). However, the company also notes a risk that gravity high anomalies "may not be mineralized or could be a different type of geology" (October 2025).
Show the other 3 statements
Economics 5 statements
Financing 5
Key takeaway. Management reports raising $18 million in total, which funds 70,000 meters of drilling going forward (April 2026).
Read the full summary
In October 2025, the company said it had $8.4 million in cash and needed about 25,000 meters of funded drilling over the next 18 months. The more recent figure of 70,000 meters suggests the program was significantly expanded after that earlier update.
Show the other 2 statements
Timeline 7 statements
Timeline 7
Key takeaway. Group Eleven Resources has outlined a busy near-term schedule.
Read the full summary
Management said that as of June 2026, five rigs are drilling—four at Ballywire and one at Stone Park—and the company expects a mineral resource estimate within 12 to 18 months. Looking further ahead, the company noted in April 2026 that the typical timeline from exploration to cash flow is 10 to 15 years, though that could be shortened if a critical metals designation is achieved within 12 months. By October 2025, management had planned more than 25,000 metres of drilling over the following 18 months, carrying into 2027.
Show the other 4 statements
Corporate 7 statements
Management 4
Key takeaway. Management of Group Eleven Resources points to a leadership team with deep industry experience.
Read the full summary
The company notes that CEO Barorski and David Furlong co-founded Group Eleven and have run it for the past decade, while Mark Holdtock — a member of the team — discovered part of the largest zinc deposit in Ireland at Navin. Additionally, Barry O'Shea was appointed a director, with past roles as CEO of Highland Copper, CFO of Fiore Gold (2018-2021), and VP of Business Development at New Gold (2010-2017). The company also reports that Glen Core and Michael Gentille are its top two shareholders.
Show the other 1 statement
Market 1
Sources 4 interviews
Every interview 4
| Date | Channel | Interview | Statements |
|---|---|---|---|
| 29 Jun 2026 | Crux Investor | Group Eleven Resources (TSXV:ZNG) - Drilling Ireland's Best Zinc-Silver-Copper Discovery in Decades | 10 |
| 29 Apr 2026 | Crux Investor | Group Eleven Resources (TSXV:ZNG) - $18M Funds 70,000m Drill Program | 12 |
| 09 Oct 2025 | Crux Investor | Group Eleven Resources (TSXV:ZNG) - 25,000m Drill Program Targets Multi-Metal Growth | 12 |
| 07 Oct 2025 | Crux Investor | Group Eleven Resources (TSXV:ZNG) - Pitch Perfect, October 2025 | 23 |
What else those interviews covered
Every other asset named in the same recordings, by how many of them named it — the company's coverage context, not its holdings. Where the name is another company we hold a record for, it links to it.
Questions people ask
What is Group Eleven Resources's project and where is it?
Group Eleven Resources is a explorer zinc company, with a project stated to be in Ireland. Everything here is drawn from its executives' own interviews.
Which interviews mention Group Eleven Resources?
We track 4 interviews mentioning Group Eleven Resources, across 1 channel (Crux Investor).
What are investors saying about Group Eleven Resources?
No independent commentary is on record yet — so far the page carries only the company's own voice.
What do recent interviews with Group Eleven Resources cover?
The most-discussed topics on record are the deposit, timeline, jurisdiction, technical risk — each claim quoted and dated in the sections above.