← Back to TranscriptAgent TranscriptAgent
← All mining companies

Ionic Rare EarthsASX:IXR

Rare earths developer, with a project stated to be in Ireland.

NoneIreland — as stated on the recordings

developer rare earths NoneIreland
Jun 2026Covered
7 of 10Topics on record
1 executiveNamed on the record
Stage
Developer
Primary commodity
Rare Earths
Jurisdiction
Ireland
Latest appearance
22 Jun 2026
On record
1 interview · 12 statements · 1 executive

At a glance

What the record holds today. Every card names where it came from — a management representation is not an established fact, and the page never blurs the two.

What is in the ground
400 tons of separated rare earth oxides
Management-stated Tim Harrison Jun 2026
Money on hand
12 million pounds grant from UK government
Stated capital need: 85 million pound
Management-stated Tim Harrison Jun 2026
What happens next
by September of this year
Management-stated Tim Harrison Jun 2026
The main open question
Management's demonstration plant currently produces only 10 tons per annum of separated rare earth oxides—an order of magnitude below the planned 400-ton commercial facility—creating execution risk on scaling.
Weighed from the statements below, not our opinion of the company.
Our reading

Management view vs outside view

Management interviews are promotional by nature; the outside view is the counterweight. Both are quoted from the recordings, not added by us.

What management spends its time on

Counted from Ionic Rare Earths's own claims across 1 interview — most-covered theme first.

What outside voices pick up on

No independent commentary on record yet — so far the page carries only the company's own voice.

Bull · Bear · Watch next

Weighed from the statements on this page — management's pitch and the outside view. Not financial advice, and not our opinion of the company.

▲ Bull case

Management says the 85 million pound magnet recycling plant in Belfast will generate a 500+ million pound post-tax NPV with 40+ percent IRR and two-year payback, underpinned by validated supply contracts with Ford and Advanced Magnet…

What it rests on
Evidence: 2 moments from 1 interview
Read the full case

Management says the 85 million pound magnet recycling plant in Belfast will generate a 500+ million pound post-tax NPV with 40+ percent IRR and two-year payback, underpinned by validated supply contracts with Ford and Advanced Magnet Laboratories for US defense applications. The company has already secured 12 million pounds in UK government grant backing and claims technology readiness at level 8.

▼ Bear case

Management's demonstration plant currently produces only 10 tons per annum of separated rare earth oxides—an order of magnitude below the planned 400-ton commercial facility—creating execution risk on scaling.

What it rests on
Evidence: 1 moment from 1 interview
Read the full case

Management's demonstration plant currently produces only 10 tons per annum of separated rare earth oxides—an order of magnitude below the planned 400-ton commercial facility—creating execution risk on scaling. The 85 million pound capital requirement remains to be fully raised, and no independent validation of the economics, market demand, or technical assumptions is on record.

◆ Watch next

Final investment decision targeted for September this year; full 85 million pound financing lock-down; progress from 10-ton demonstration to 400-ton production scale; validation and offtake agreements beyond Ford and Advanced Magnet…

What it rests on
Evidence: 1 moment from 1 interview
Read the full case

Final investment decision targeted for September this year; full 85 million pound financing lock-down; progress from 10-ton demonstration to 400-ton production scale; validation and offtake agreements beyond Ford and Advanced Magnet Laboratories.

Each moment links to the exact point in the source recording. The cases are drawn from the transcripts, weighed as written — they are not a rating, a target or a recommendation.

Project 4 statements

The deposit 1

What was actually said
resource size
400 tons of separated rare earth oxides
“that'll produce 400 tons of separated rare earth oxides.”
Tim Harrison· 22 Jun 2026·

Jurisdiction 1

What was actually said
country
Northern Ireland (Belfast)
“with uh with what we're doing um on on magnet recycling”
Tim Harrison· 22 Jun 2026·

Technical risk 2

Key takeaway. Management acknowledges that the demonstration plant, producing about 10 tons per annum, is not enough to keep up with demand.

Read the full summary

A key assumption in their planning is a technology readiness level of eight, as of June 2026.

What was actually said
key assumption
technology readiness level eight
“so we would be at what's classed as a technology readiness level eight, right?”
Tim Harrison· 22 Jun 2026·
stated risk
demonstration plant producing around 10 tons per annum, not enough to keep up with demand
“we're with our demonstration plant, we're producing annually, uh you know, at an annualized rate of around about 10 tons per annum of separated separated oxides.”
Tim Harrison· 22 Jun 2026·

Economics 6 statements

Economics 4

Key takeaway. In a June 2026 update, management said the project has an NPV north of £500 million post-tax, an IRR around 40-plus percent, and a payback period of just over two years.

Read the full summary

The company also reported a capital expenditure of £85 million.

What was actually said
capex
85 million pound
“for an 85 million pound magnet recycling plant in Belfast.”
Tim Harrison· 22 Jun 2026·
irr
around 40 plus percent
“IRR was around 40 plus percent.”
Tim Harrison· 22 Jun 2026·
npv
north post-tax of 500 million
“NPV was north post-tax of 500 million um, for an 85 million pound magnet recycling plant in Belfast.”
Tim Harrison· 22 Jun 2026·
Show the other 1 statement
payback
just over two years
“payback was just over two years”
Tim Harrison· 22 Jun 2026·

Financing 2

Key takeaway. Management reports the company has received a £12 million grant from the UK government, and estimates total capital needed at $85 million, both as of June 2026.

What was actually said
capital needed
85 million
“We're expecting to have that full 85 million raised, locked down.”
Tim Harrison· 22 Jun 2026·
cash position
12 million pounds grant from UK government
“a grant that we received from the UK government earlier this year from the Advanced Propulsion Centre of 12 million pounds.”
Tim Harrison· 22 Jun 2026·

Timeline 1 statement

Timeline 1

What was actually said
first production
by September of this year
“getting to an a final investment decision by September of this year.”
Tim Harrison· 22 Jun 2026·

Corporate 1 statement

Market 1

What was actually said
strategic interest
validation with Ford motor and Advanced Magnet Laboratories for US defense
“material now as the first uh recycler of of separated uh magnet rare earth oxides that have now been validated in a uh a motor um being produced by Ford.”
Tim Harrison· 22 Jun 2026·

Sources 1 interview

Every interview 1

DateChannelInterviewStatements
22 Jun 2026 Crux Investor Ionic Rare Earths (ASX:IXR) - Belfast Plant Nears 2026 FID as Heavy Rare Earth Prices Surge Globally 12

What else those interviews covered

Every other asset named in the same recordings, by how many of them named it — the company's coverage context, not its holdings. Where the name is another company we hold a record for, it links to it.

advanced magnet laboratories 1
belfast plant 1
ford 1
uk government grant 1
us strategic metals 1

Questions people ask

What is Ionic Rare Earths's project and where is it?

Ionic Rare Earths is a developer rare earths company, with a project stated to be in Ireland. Everything here is drawn from its executives' own interviews.

Which interviews mention Ionic Rare Earths?

We track 1 interview mentioning Ionic Rare Earths, across 1 channel (Crux Investor).

What are investors saying about Ionic Rare Earths?

No independent commentary is on record yet — so far the page carries only the company's own voice.

What do recent interviews with Ionic Rare Earths cover?

The most-discussed topics on record are economics, financing, technical risk, the deposit — each claim quoted and dated in the sections above.

How to read this page

What is here

Statements made by company representatives in the interviews listed above — each one carrying the words that made it, the date, and the recording. Nothing is added from any other source: if it was not said on a recording, it is not on this page. The one exception lives in the Claims & Checks record, which cites a metal price from our own feed so a stated cost can be set against it — and labels it as ours wherever it appears.

What is not verified

All of it. Resource figures, economics, timelines and promotional framing are management's own representations, checked against no filing and no technical report. Transcripts are automatic; we repair a clearly mis-heard word but never a number, a date, a unit or a speaker's hedge — “about 8.6 million ounces” keeps its “about”.

How to use it

Treat it as a map of what has been said, not as a source of fact. Where a figure matters to you, open the recording and read the company's filings. Nothing here is financial advice, a recommendation, or an offer to buy or sell any security — these are interested parties discussing their own company.

Workspace Intelligence
YOUR AGENT
Investigation
Open the latest investigation, or start a new one from the left.

Notice

Loading…